Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20010490
    Veröffentlichungsdatum: 16 November 2001

    Projektträger – zwischengeschaltetes Finanzinstitut

    The National Roads Authority (NRA) through the Local Government and the Regions (Westmeath, Meath and Kildare County Councils)

    Ort

    Beschreibung

    The project comprises the design, construction, finance and operation (DBFO), during a concession period of 30 years, of approximately 35km of 2x2 lane motorway running parallel and replacing the N4 from the existing M4 motorway at Kilcock to the N4/N6 junction at Kinnegad

    Ziele

    The construction of the new motorway will deliver a high quality route that would offer a greatly improved service for users and be capable of accommodating significant traffic volumes. Expected immediate benefits are:

    • improvement of traffic flows in a heavily congested zone,
    • reductions in travel time,
    • reductions in vehicle operating costs.

    At the same time, traffic safety is expected to increase.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    Up to 50% of the total project cost

    Gesamtkosten (voraussichtlicher Betrag)

    Project cost will only be known when the preferred bidder has been appointed

    Umweltaspekte

    The promoter is required to respect the regulations imposed by the Directive 97/11/EC. The EIB will review the environmental impact assessment required under the statutory approval process in the Ireland

    Auftragsvergabe

    The project was advertised in the Official Journal of the EU on 30 November 2000 in accordance with Directive 93/37/CEE. NRA received pre-qualification submissions from consortia in January 2001. Four consortia were subsequently invited to submit tenders by 18 February 2002. The NRA expects to choose a preferred bidder by end June 2002 and sign the concession agreement (the DBFO contract) by end August 2002

    Projektstatus

    Unterzeichnet - 24/03/2003

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Irland Verkehr