Suche starten DE menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten

    Übersicht

    Veröffentlichungsdatum
    2 Juni 2025
    Projektstatus
    Referenz
    Genehmigt | 16/06/2025
    20240447
    Projekttitel
    Projektträger – Finanzintermediär
    MADRID ALLOCATION GREEN ENERGY FL 20200212
    AENA SME SA
    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
    Gesamtkosten (voraussichtlicher Betrag)
    EUR 98 million
    EUR 109 million
    Ort
    Sektor(en)
    Beschreibung
    Ziele

    Financing of a photovoltaic project in the Spanish airport of Madrid Barajas (142MWp). This is an allocation under the framework loan (FL) AENA COVID-19 GREEN ENERGY LOAN FL (2020-0212).

    This project will contribute to the achievement of both national and EU energy and decarbonisation objectives, and increase self-sufficiency and sustainability of airport operations. The financing of this project would contribute to the EIB's lending policy on renewable energy and climate action.

    Zusätzlichkeit und Wirkung

    The Project increases renewable energy generation capacity in Spain and contributes to national and EU 2030 climate objectives and REPowerEU Action Plan. The proposed Project contributes to the EIB Group's 2024-2027 Strategic Roadmap, and specifically to Energy (100%), Climate Action and Environmental Sustainability (100%, including 100% of mitigation).


    The financing of this Project also contributes to Bank's lending priority objectives on Energy (Renewable Energy) as well as on Climate Action (mitigation) and Environmental Sustainability (Pollution Prevention Control). The Project produces electricity from low carbon sources (solar PV), addressing the market failure of negative climate and environmental externalities, through the reduction of carbon emissions and air pollution (compared to fossil-fuel generation). It is expected to yield very good quality and results due to avoided greenhouse gas emissions, excellent rated broader social benefits, fair employment creation and an adequate governance system. The EIB provides an important financial contribution as it provides a financing benefit, longer tenor and customised terms to the borrower. Finally, the non-financial contribution rests primarily on a signalling effect to the banking system with regards to supporting renewable investments at advantageous terms.

    Umweltaspekte
    Auftragsvergabe

    Due to its technical characteristics, the photovoltaic (PV) plants fall under EIA Directive 2011/92/EU as amended by the Directive 2014/52/EU, requiring the competent authorities to determine whether an Environmental Impact Assessment (EIA) is required. The PV plant, including its grid connection infrastructure was initially subject to an ordinary EIA process. Subsequently, Spanish Real Decreto-ley 6/2022 was adopted, introducing measures to streamline renewable energy projects amidst the energy crisis related to the Ukraine war. The project met the criteria outlined in Article 6 of this regulation, requiring the project to transition to a simplified environmental assessment procedure and requiring the preparation of an Executive Summary quantifying the project's environmental impacts. Finally, based on the promoter's provided documentation, the competent authority issued a favourable opinion, concluding the environmental permitting process. The project site does not overlap with any protected areas, and no direct or indirect impacts are expected. The closest Natura 2000 site to the Project is SAC "Cuencas de los ríos Jarama y Henares" (ES3110001) at 410 m.

    The promoter is a public undertaking, subject to EU procurement directives. The promoter has confirmed that contracts for the implementation of the project have been and will be tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/23/EU / 2014/24/EU / 2014/25/EU, where applicable, as well as Directive 92/13/EEC or Directive 89/665/EEC, as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required. According to the promoter, the implementation of the project, including procurement of the main components, has been awarded to contractor Construcciones San José. Solar PV modules will be supplied by Trina Solar.

    Phase
    Genehmigt
    16 Juni 2025
    Projekte zum thema
    Übergeordnetes Projekt

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Dokumente

    Formblatt ökologische und soziale Aspekte - MADRID ALLOCATION GREEN ENERGY FL 20200212
    Datum der Veröffentlichung
    18 Jun 2025
    Sprache
    Bereich
    Finanzierung
    Nummer des Dokuments
    240662241
    Thema
    Umweltinformationen
    Projektnummer
    20240447
    Sektor(en)
    Länder
    Öffentlich zugänglich
    Jetzt herunterladen

    Allgemeine Fragen und Anmerkungen

    Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträger, sich konstruktiv einzubringen.
    Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
    Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
    Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

    Medienanfragen

    Medienanfragen können Sie an die Pressestelle der EIB. Bitte besuchen Sie auch unseren Pressebereich.

    Beschwerdeverfahren

    Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht das Beschwerdeverfahren der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

    „Null Toleranz“ gegenüber Betrug und Korruption

    Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und der Betrugsbekämpfungspolitik behandelt.

    Weitere Veröffentlichungen