Suche starten DE menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten

Unterzeichnung(en)

Betrag
175.000.000 €
Länder
Sektor(en)
Portugal : 175.000.000 €
Energie : 175.000.000 €
Unterzeichnungsdatum
14/01/2026 : 175.000.000 €
Link zum projekt

Übersicht

Veröffentlichungsdatum
22 Januar 2026
Projektstatus
Referenz
Unterzeichnet | 14/01/2026
20240332
Projekttitel
Projektträger – Finanzintermediär
IBERDROLA TAMEGA WIND HYBRIDISATION GREEN LOAN
COMPANIA ESPANOLA DE SEGUROS DE CREDITO A LA EXPORTACION SA COMPANIA D,IBERDROLA SA
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Gesamtkosten (voraussichtlicher Betrag)
EUR 175 million
EUR 347 million
Ort
Sektor(en)
Beschreibung
Ziele

The project concerns the construction and operation of two wind farms in northern Portugal, with a total installed capacity of 274 MW.

The wind farms will use 7.2 MW wind turbines and will be connected to the existing substations of the Tâmega hydropower plant (also financed by the EIB) through two dedicated 400 kV transmission lines of approximately 8 km and 3 km, respectively.

Additionality and Impact

The Project concerns the development and operation of a portfolio of wind farms in Portugal. It will support the 2030 targets set out in the National Energy and Climate Plan and the REPowerEU action plan.


The financing of this Project also contributes to the Bank's lending priority objectives on Energy (Renewable Energy), Environmental Sustainability and Climate Action (transversal) as well as Social and Economic Cohesion.


As the Project will produce electricity from low carbon sources, it will address the market failure of negative climate and environmental externalities, through the reduction of carbon emissions and air pollution (compared to fossil-fuel generation).


It is expected that the Project will rely on revenues from (i) commercial power purchase agreements ("cPPAs") and (ii) the wholesale market, therefore it is expected to improve market efficiency and competition.


On Project quality, the level of the Promoter's governance and risk management capability after mitigation measures is deemed very good. The Project is expected to have an excellent economic return, considering the economic value of the electricity generated.


The EIB's financing provides an additional source of funding to the Promoter. The Bank's financial contribution is considered very good and valuable to the client, as the EIB's offering is more favourable than market alternatives and the "EIB Green Loan" label is deemed as a stamp of quality on the Promoter's investments.

Umweltaspekte
Auftragsvergabe

Windfarms falls under Annex II of Directive 2011/92/EU (as amended by Directive 2014/52/EU) according to which the Member States shall determine, based on defined criteria, whether the project shall be subject to a mandatory EIA, including public consultation. Due to their technical characteristics (length), the 400kV overhead transmission lines needed for the connection of the projects to the grid, also fall under Annex II of the EIA Directive. The Project consists of two wind farms, north and south of the TAMEGA hydro power plant respectively. The Southern wind farm entails 7 wind turbines in the border and marginally within the Natura 2000 site Alvão Marão (PTCON0003) and IBA Serra do Alvão e Marão. A single EIA process covering both sites/WFs and their ancillary infrastructure has been completed, and the relevant environmental approval was granted. The approval includes several sets of measures to be implemented by the promoter and comprehensive biodiversity monitoring requirements. The requirements of the Environmental Impact Assessment Directive 2011/92/EU as amended by Directive 2014/52/EU, Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC will be verified during appraisal. The project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate mitigation, pollution prevention and control.

The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions. However, if at the project appraisal, the EIB were to conclude that the promoter is subject to the EU public procurement legislation then the Bank would duly inform the Commission Services and would require the promoter to apply those rules.

Milestone
In Prüfung
Genehmigt
Unterzeichnet
3 September 2025
14 Januar 2026

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Dokumente

Formblatt ökologische und soziale Aspekte - IBERDROLA TAMEGA WIND HYBRIDISATION GREEN LOAN
Datum der Veröffentlichung
24 Jan 2026
Sprache
Bereich
Finanzierung
Nummer des Dokuments
234546588
Thema
Umweltinformationen
Projektnummer
20240332
Sektor(en)
Länder
Öffentlich zugänglich
Jetzt herunterladen

Aktuelles und Storys

Allgemeine Fragen und Anmerkungen

Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträger, sich konstruktiv einzubringen.
Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

Medienanfragen

Medienanfragen können Sie an die Pressestelle der EIB. Bitte besuchen Sie auch unseren Pressebereich.

Beschwerdeverfahren

Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht das Beschwerdeverfahren der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

„Null Toleranz“ gegenüber Betrug und Korruption

Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und der Betrugsbekämpfungspolitik behandelt.

Weitere Veröffentlichungen