Übersicht
The project concerns the construction of a commercial plant to produce lithium hydroxide from spodumene. Lithium hydroxide is one of key material used for electric vehicle (EV) batteries manufacturing. The annual production is expected to total 32 000 metric tons, enough to power over 700 000 EVs. The start of commercial operations is planned in 2028. The plant will be located in Setubal, Portugal.
The global lithium processing capacity is highly concentred, creating a strategic dependency and potential bottleneck for the EU. The project will be amongst the first to establish a sustainable supply of lithium hydroxide in Europe, a key component in lithium-ion batteries needed for the green transition. The project supports the EU's CRM Act target to achieve the local processing capacity of at least 40% of the Union's annual consumption of strategic raw materials. Furthermore, the end-users use lithium hydroxide to manufacture EV batteries that play key role in enabling the EU's green transition and in achieving the European Green Deal ambition to become climate neutral by 2050. The project is deemed to be eligible under the Sustainable Energy and Natural Resources public policy goal and in line with Annex II of the EIB's Energy Lending Policy that identifies projects related to the supply of Critical Raw Materials needed for low-carbon technologies in the European Union. As such, it contributes to both the EU and the EIB's policies and lending priorities and is therefore eligible under Article 309 point (c), Common interest.
The project is aligned with the Paris Agreement according to the EIB's latest definition as the project supports the development of electric vehicles ecosystem. The project concerns the capital investments in the construction of a greenfield manufacturing plant. These activities should fall under the Environmental Impact Assessment Directive (EIAD) ? Directive 2014/52/EU amending Directive 2011/92/EU. The EIA report and the compliance with any other applicable EU legislation (e.g., Industrial Emissions Directive, Habitats and Birds Directives) will be reviewed during the due diligence process. While the information is rather limited at the current stage of project development, the promoter has already demonstrated a progress in acquiring necessary permits and authorisations (e.g., awarded status of Project of National Interest with fast-tracking permitting decision). The contribution to climate action and environmental sustainability objectives (if any) will be assessed at the due diligence stage.
The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions. However, if at the project appraisal, the EIB were to conclude that the promoter is subject to the EU public procurement legislation then the Bank would duly inform the Commission Services and would require the promoter to apply those rules.
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).
Allgemeine Fragen und Anmerkungen
Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträgerinnen und Interessenträger, sich konstruktiv einzubringen.
Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.
Medienanfragen
Medienanfragen können Sie an die Pressestelle der EIB richten. Bitte besuchen Sie auch unseren Pressebereich.
Beschwerdemechanismus
Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht der Beschwerdemechanismus der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.
„Null Toleranz“ gegenüber Betrug und Korruption
Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und den Leitlinien für Betrugsbekämpfung behandelt.
Weitere Veröffentlichungen