Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten

    Unterzeichnung(en)

    Betrag
    649.126.446,11 €
    Länder
    Sektor(en)
    Polen : 649.126.446,11 €
    Verkehr : 649.126.446,11 €
    Unterzeichnungsdatum
    20/09/2023 : 215.503.307,98 €
    10/12/2021 : 433.623.138,13 €
    Link zum projekt

    Übersicht

    Veröffentlichungsdatum
    16 Juni 2021
    Projektstatus
    Referenz
    Unterzeichnet | 10/12/2021
    20210178
    Projekttitel
    Projektträger – Finanzintermediär
    PKP INTERCITY FLEET RENEWAL AND EXPANSION
    PKP INTERCITY
    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
    Gesamtkosten (voraussichtlicher Betrag)
    PLN 4500 million (EUR 983 million)
    PLN 10235 million (EUR 2236 million)
    Ort
    Sektor(en)
    Beschreibung
    Ziele

    The project consists of the acquisition of new electric locomotives and passenger coaches, as well as modernisation of electric multiple units and coaches. The trainsets will be used to provide long distance services throughout Poland and in neighbouring countries, mainly under a Public Service Contract.

    The project is expected to increase the quality of rail services provided in Poland as well as promote travel by rail, reducing the use of private vehicles and the associated negative impacts on the local environment, road safety and greenhouse gas (GHG) emissions and, thereby, contribute to sustainable transport in line with EU objectives. The project is largely located in a convergence zone and, by facilitating access, promotes regional development.

    Additionality and Impact

    The project consists of the acquisition and modernisation of rolling stock to be used under a Public Service Contract.

    The project is expected increase comfort of travel, allow for new and more frequent connections and thus for time savings for passengers and improve accessibility to persons with reduced mobility. By enabling modal shift from road to rail, the project will be enhancing sustainable transport in line with EU objectives and reducing negative transport externalities, such the harm to humans in terms of accidents and loss of life, or environmental externalities like noise, pollution and CO2 emissions.

    The rolling stock will be used predominantly in less developed regions and by improving their accessibility and reducing negative transport externalities in these regions, the project will support the strengthening of the EU's economic, social and territorial cohesion.

    The EIB will provide significant financing amount at affordable terms and with flexible conditions, matching the Borrower's funding needs throughout the implementation, and the expected cash generation capacity during its operation phase.

    Umweltaspekte
    Auftragsvergabe

    The investments proposed under the project do not fall under either Annex I or Annex II of the Environmental Impact Assessment Directive 2011/92/EU as amended by Directive 2014/52/EU as manufacturing and use of rail rolling stock is not included in either list. The need for an environmental impact assessment (EIA) and/or assessment according to the Habitats Directive for associated facilities (e.g. maintenance workshops or depots) will be analysed during the appraisal. All else equal, the project is expected to have a positive environmental impact by helping the railways to maintain modal share in key sections of the passenger market that are most appropriately met by rail. In addition, the arrangements for the scrapping of the replaced stock will be checked during appraisal.

    The Bank will require the Promoter to ensure that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Link zum projekt

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Dokumente

    Formblatt ökologische und soziale Aspekte - PKP INTERCITY FLEET RENEWAL AND EXPANSION
    Datum der Veröffentlichung
    10 Nov 2021
    Sprache
    Bereich
    Finanzierung
    Nummer des Dokuments
    149427183
    Thema
    Umweltinformationen
    Projektnummer
    20210178
    Sektor(en)
    Länder
    Öffentlich zugänglich
    Jetzt herunterladen

    Aktuelles und Storys

    Photogallery

    Allgemeine Fragen und Anmerkungen

    Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträgerinnen und Interessenträger, sich konstruktiv einzubringen.
    Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
    Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
    Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

    Medienanfragen

    Medienanfragen können Sie an die Pressestelle der EIB richten. Bitte besuchen Sie auch unseren Pressebereich.

    Beschwerdemechanismus

    Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht der Beschwerdemechanismus der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

    „Null Toleranz“ gegenüber Betrug und Korruption

    Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und den Leitlinien für Betrugsbekämpfung behandelt.

    Weitere Veröffentlichungen