Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten

    Unterzeichnung(en)

    Betrag
    386.784.500 €
    Länder
    Sektor(en)
    Spanien : 386.784.500 €
    Energie : 386.784.500 €
    Unterzeichnungsdatum
    16/11/2023 : 4.341.500 €
    16/11/2023 : 57.443.000 €
    21/10/2021 : 325.000.000 €
    Link zum projekt

    Übersicht

    Veröffentlichungsdatum
    25 Oktober 2021
    Projektstatus
    Referenz
    Unterzeichnet | 21/10/2021
    20200452
    Projekttitel
    Projektträger – Finanzintermediär
    TITAN SOLAR PV GREEN FRAMEWORK LOAN
    GALP ENERGIA SGPS SA
    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
    Gesamtkosten (voraussichtlicher Betrag)
    EUR 650 million
    EUR 1302 million
    Ort
    Sektor(en)
    Beschreibung
    Ziele

    The project consists of the development of a portfolio of solar photovoltaic (PV) farms with a total installed capacity of around 2GW, located across Spain.

    The project consists of the financing of renewable solar PV projects in Spain. The Promoter has submitted a preliminary pipeline of 20 utility scale renewable energy schemes, for a total capacity of ca. 2 GW. Schemes are located in various regions of Spain.

    Additionality and Impact

    The project increases renewable energy generation capacity in Spain and contributes to national and EU 2030 climate objectives. The financing of this project also supports the Bank's lending priority objectives in energy (renewable energy), climate action, and economic and social cohesion. Electricity is produced from low carbon sources (solar PV), addressing the market failure of negative climate and environmental externalities, through the reduction of carbon emissions and air pollution (compared to fossil-fuel generation). As the schemes are expected to rely (at least partially) on revenues from the market (the wholesale market and unsubsidized commercial Power Purchase Agreements), in a sector characterised by incomplete markets, the project improves market efficiency and competition (limited forward/hedging possibility, lack of scarcity pricing and lack of locational pricing). The Project is expected to yield very good quality and results due to excellent social benefits, fair employment creation and adequate governance system. With the appropriate conditions in place, the project is acceptable for financing in environmental and social terms. All the schemes are expected to be located in cohesion regions.

    Supporting this solar PV portfolio at an early stage and with a meaningful amount of financing will be instrumental in accelerating the implementation of the Project and in attracting commercial lenders to complement the participation of the EIB in the non-recourse financing tranche. The combination within a Framework Loan of a Corporate Loan and Project Finance Loan is innovative and provides the Promoter with flexibility and financial value added, which is deemed crucial mainly in the context of the ongoing Covid pandemic. The EIB, as a reference financier with the strictest standards in terms of sustainability and environmental protection, is expected to provide also an important signalling effect. Accordingly, EIB financing with a "Green Loan" label is expected to contribute to attract investors and co-financiers. This also helps Galp in the achievement of its emerging de-carbonisation strategy and clearly emphasises the role of EIB as the EU Climate Bank.

    Umweltaspekte
    Auftragsvergabe

    This operation is intended to generate environmental benefits by supporting renewable energy projects that help mitigate climate change. The schemes are expected to fall under Annex II of the EIA-Directive (2014/52/EU amending 2011/92/EU), requiring the competent authorities to determine whether an environmental impact assessment (EIA) is required. Aerial power lines for the interconnection to the grid included in the Annex I of the EIA Directive, if any, will be expected to be subject in all cases to an EIA process. It is expected that a few plants of the initial pipeline have already obtained their environmental license (Declaracion de Impacto Ambiental), and the rest of the processes are still ongoing or under preparation. The Bank will assess the capacity and procedures of the Promoter to ensure the schemes' compliance with the sector-relevant national and European environmental and biodiversity regulations. The EIA studies and the permitting process will be assessed during the appraisal of the individual schemes, in particular cumulative impacts and conformity with relevant EU Directives, including Habitats (92/43/EEC) and Birds (2009/147/EC).

    The Promoter has been assessed by the EIB as being a private company not subject to EU rules on public procurement or concessions. However, if at the project appraisal, the EIB were to conclude that the Promoter is subject to EU public procurement legislation then the Bank would duly inform the Commission Services and would require the Promoter to apply those rules.

    Projekte zum thema
    Related sub-project
    Link zum projekt

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Dokumente

    Formblatt ökologische und soziale Aspekte - TITAN SOLAR PV GREEN FRAMEWORK LOAN
    Datum der Veröffentlichung
    1 Feb 2022
    Sprache
    Bereich
    Finanzierung
    Nummer des Dokuments
    137925883
    Thema
    Umweltinformationen
    Projektnummer
    20200452
    Sektor(en)
    Länder
    Öffentlich zugänglich
    Jetzt herunterladen
    Umwelt- und Sozialverträglichkeitsprüfung - TITAN SOLAR PV GREEN FRAMEWORK LOAN - LOGRO SOLAR
    Datum der Veröffentlichung
    10 Jan 2023
    Sprache
    Bereich
    Finanzierung
    Nummer des Dokuments
    165776060
    Thema
    Umweltinformationen
    Projektnummer
    20200452
    Sektor(en)
    Länder
    Öffentlich zugänglich
    Jetzt herunterladen
    Umwelt- und Sozialverträglichkeitsprüfung - TITAN SOLAR PV GREEN FRAMEWORK LOAN - MANZANARES SOLAR
    Datum der Veröffentlichung
    11 Jan 2023
    Sprache
    Bereich
    Finanzierung
    Nummer des Dokuments
    165757399
    Thema
    Umweltinformationen
    Projektnummer
    20200452
    Sektor(en)
    Länder
    Öffentlich zugänglich
    Jetzt herunterladen

    Aktuelles und Storys

    Allgemeine Fragen und Anmerkungen

    Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträgerinnen und Interessenträger, sich konstruktiv einzubringen.
    Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
    Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
    Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

    Medienanfragen

    Medienanfragen können Sie an die Pressestelle der EIB richten. Bitte besuchen Sie auch unseren Pressebereich.

    Beschwerdemechanismus

    Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht der Beschwerdemechanismus der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

    „Null Toleranz“ gegenüber Betrug und Korruption

    Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und den Leitlinien für Betrugsbekämpfung behandelt.

    Weitere Veröffentlichungen