Link zum projekt
Datenblätter
Andere Links
Übersicht
Veröffentlichungsdatum
29 April 2008
Projektstatus
Referenz
Unterzeichnet | 04/12/2009
20080014
Projekttitel
Projektträger – Finanzintermediär
Cimpor Yibitas Ankara Clinker Plant
Cimpor Inversiones, S.A.
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Gesamtkosten (voraussichtlicher Betrag)
Up to EUR 50 million.
EUR 120 million.
Beschreibung
Ziele
Construction of a clinker line at an existing grinding plant.
Reduce costs due to the replacement of clinker bought from third parties, strengthen Turkey’s industrial base, and stimulate economic development.
Umweltaspekte
Auftragsvergabe
The project would fall under Annex II of 97/11 Directive amended by 2003/35, which leaves the determination on the EIA to national legislation. Based on preliminary EIA studies, the Public Authority decided that a full EIA is not required due to the location within an existing industrial zone and atmospheric emissions of new production to be in line with EU standards.
EU procurement legislation would not apply to this private sector project even if the project were located .in the EU.
Link zum projekt
Übersicht
Andere Links
Datenblätter