Link zum projekt
Datenblätter
Andere Links
Übersicht
Veröffentlichungsdatum
14 Juli 2004
Projektstatus
Referenz
Unterzeichnet | 29/11/2005
20020639
Projekttitel
Projektträger – Finanzintermediär
AVE Cordoba – Malaga – Priority TEN
Gestor de Infraestructuras Ferroviarias (GIF).
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Gesamtkosten (voraussichtlicher Betrag)
Up to 50% of the total project cost.
Around EUR 2000 million.
Beschreibung
Ziele
The project consists of the construction of the high-speed rail infrastructure between Cordoba and Malaga, both located in the Region of Andalucia (objective 1 area).
The project is a priority TEN and a key component of the Spanish high-speed rail network. The new line will connect with the existing high speed line from Seville to Madrid, and from there to Barcelona and France, thus providing interoperability with the European rail network.
Umweltaspekte
Auftragsvergabe
Compliance with EU environmental directives and national laws shall be ensured.
Compliant with EU Directives.
Kommentar(e)
Rail.
Link zum projekt
Übersicht
Andere Links
Datenblätter
Zugehörige Pressemitteilungen
Aktuelles und Storys
Link zum projekt
Andere Links