Suche starten DE menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten

Improvement of Drinking Water and Sanitation Systems in Mombasa; Lot 3- Construction of North Mainland Transmission Main and Nguu Tatu Storage Reservoir

  • Date: 03/06/2025
  • Reference: 20220857-03

The Contract will include Construction of a DN 800 Water Transmission Pipeline (Steel or Ductile Iron), length 21.8km, Construction of 1Nr. 14,000m3 capacity Reinforced Concrete Storage Reservoir at Nguu Tatu and Rehabilitation of the existing 3Nr. Nguu Tatu Reservoirs of total capacity 27.000m3.  

Corrigendum

Contract notice

  • Download the notice of 03/06/2025
  • Deadline for receipt of tenders or requests to participate: 24/07/2025

Disclaimer

This procurement is conducted by the EIB Borrowers/Promoters in accordance with the Guide to Procurement for the contract under the EIB-financed project. The EIB is not a party to the contract and its role is limited to those defined in the Guide to Procurement.