Referenz: 20250076
Veröffentlichungsdatum: 25 Juni 2025

Projektträger – zwischengeschaltetes Finanzinstitut

CONSORCIO PARA EL ABASTECIMIENTO DE

Ort

Beschreibung

The project will support the promoter's 2022-2032 Water Supply Investment Programme in Asturias, a region of northwest Spain. The related schemes will mainly focus on water conveyors, interconnections and water treatment infrastructure.

Ziele

The aim is to increase the production capacity of water treatment, improve water quality and enhance the resilience of supply services during periods of water scarcity. Ultimately, the objective is ensure that the water needs of the local population and industries are adequately met in both quantity and quality.

Sektor(en)

  • Wasser, Abwasser - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 67 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 177 million

Umweltaspekte

The investment focuses on enhancing the infrastructure of the water supply system to improve its resilience, resulting in positive social benefits. The promoter will be required to comply with the EU Water Framework Directive (2000/60/EC) as well as the related EU and national environmental legislation, notably under the environmental impact assessment (EIA) Directive 2011/92/EU (as amended by the Directive 2014/52/EU), Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC).

Auftragsvergabe

The promoter shall ensure that contracts for the project implementation will be tendered in accordance with the applicable EU procurement legislation, 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required. The procurement procedure has not yet been completed and consequently there is no information on the contractor.

Projektstatus

In Prüfung

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Spanien Wasser, Abwasser