Suche starten DE menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten

Übersicht

Veröffentlichungsdatum
12 Juni 2025
Projektstatus
Referenz
In Prüfung | 18/02/2025
20240169
Projekttitel
Projektträger – Finanzintermediär
PORT OF GOTHENBURG I
GOETEBORGS HAMN AB
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Gesamtkosten (voraussichtlicher Betrag)
SEK 750 million (EUR 68 million)
SEK 1700 million (EUR 155 million)
Ort
Sektor(en)
Beschreibung
Ziele

The project, situated in the Port of Gothenburg within the city of Gothenburg, involves the reinforcement and deepening of approximately 700 meters of quay walls to facilitate containerised cargo handling. It forms part of the Skandiaporten project, a collaboration between the Swedish Transport Administration, the Swedish Maritime Administration and the Port of Gothenburg which aims at increasing the capacity of the deep-sea terminal to accommodate larger and/or more loaded ships. The related works include, among among other activities, excavation, bank piling to secure the rock bottom, a new crane beam, replacement of sheet piling, construction of a new quay front, dredging, and erosion protection measures.

The aim is to contribute to the decarbonisation of a high-emitting transport sector by investing in critical infrastructure.

Umweltaspekte
Auftragsvergabe

The project falls under Annex I of the environmental impact assessment (EIA) Directive 2011/92/EU as amended by Directive 2014/52/EU. The final environmental decision was issued by the competent authority on 24 October 2022 and included mitigation measures in relation to the disposal of dredged materials, the prevention of excessive turbidity levels during the works and the management of piling activities, the management of vessel traffic and the establishment of a control programme for dredging disposal activities. Where and if applicable and based on a risk-based approach as defined in the EIB Group Environmental and Social policy, the requirements of the EIADirective 2011/92/EU as amended by Directive 2014/52/EU, Birds Directive 2009/147/EC, Habitats Directive 92/43/EEC and Water Framework Directive (WFD) 2000/60/EC (to be completed as relevant/applicable) will be checked during appraisal.

The EIB will require the promoter to ensure that contracts for implementation of the project have been tendered in accordance with the applicable EU procurement legislation, Directive 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required. The promoter carried out a public tendering/procurement process from Q3/2019 to Q3/2020, as a turnkey contract with extended collaboration (partnering). The process was done in accordance with the national law regulating procurement by entities operating in the water, energy, transport and postal services sector (Swedish: lag (2016:1146) om upphandling inom försörjningssektorerna). This law implements directive 2014/25/EU of the European Parliament of the European Parliament and of the Council of 26 February 2014 on public procurement and repealing directive 2004/17/EG. A negotiated procedure with prior call for competition was used. The contract includes both detailed design and thereafter construction, without any additional procurement. Since the detailed design phase was planned to last for almost 3 years, the contract needed to be signed several years before the construction works were planned to start. In July 2020 the promoter signed a contract with NCC (Sweden) which enabled them to start the first phase of the contract (detailed design). The second part of the contract (construction works) was signed on 1 December 2023 to enable construction works to start in 2024.

Milestone
In Prüfung
Link zum projekt

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Allgemeine Fragen und Anmerkungen

Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträgerinnen und Interessenträger, sich konstruktiv einzubringen.
Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

Medienanfragen

Medienanfragen können Sie an die Pressestelle der EIB richten. Bitte besuchen Sie auch unseren Pressebereich.

Beschwerdemechanismus

Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht der Beschwerdemechanismus der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

„Null Toleranz“ gegenüber Betrug und Korruption

Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und den Leitlinien für Betrugsbekämpfung behandelt.

Weitere Veröffentlichungen