Recherche EN menu en Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

Signature(s)

Montant
50 000 000 €
Pays
Secteur(s)
Macédoine du Nord : 50 000 000 €
Eau, assainissement : 50 000 000 €
Date(s) de signature
23/11/2022 : 50 000 000 €
Lien vers la source

Fiche récapitulative

Date de publication
25 octobre 2021
Statut
Référence
Signé | 23/11/2022
20180837
Nom du projet
Promoteur – Intermédiaire financier
MUNICIPAL WATER INFRASTRUCTURE NORTH MACEDONIA
PUBLIC ENTITY(IES),REPUBLIC OF NORTH MACEDONIA
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 50 million
EUR 100 million
Lieu
Secteur(s)
  • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution
Description
Objectifs

The project consists of the construction and rehabilitation of water supply, wastewater collection and treatment infrastructure, and emergency flood protection measures for the 80 municipalities of the country under a framework managed at national level by the Ministry of Environment and Physical Planning. This project is in continuation of 2008-0446 WATER SUPPLY AND WASTE WATER COLLECTION.

The project aims at supporting the Promoter's capital investment programme at municipal level in most aspects relating to water supply, collection or treatment, alongside national budget support, European Union contributions and other International Financial Institutions (IFIs)/Development Finance Institutions (DFIs) co-financing. The underlying driver is the need to increase water supply in urban and/or rural areas and to improve waste water disposal throughout the country, thereby increasing living standards, in compliance with all relevant EU Directives. The loan concerns investments in most of the municipalities of the country.

Additionality and Impact

The project consists of the construction and rehabilitation of water supply, wastewater collection and treatment infrastructure, and emergency flood protection measures for the eighty municipalities of North Macedonia. The project is a strategic investment for the country and a priority in view of their accession path and adherence to EU directives, standards and acquis. The project is fully in line with National Strategies, EU policies as well as the Sustainable Development Goals.

 

This project contributes to supporting economic growth and environmental sustainability by improving the coverage, quality and resilience of integrated water services and reducing pollution of watercourses. Collection systems are generally old in North Macedonia and only a minority of the sewage is currently treated with most of the wastewater being discharged directly into rivers and lakes. The project will contribute to closing a significant investment gap in the sector and provide the Government and the Municipalities with a large and long-term financing source, at terms currently un-matched by the market.

 

EIB's contribution is substantial, representing some 40% of the municipal water infrastructure planned investments and rehabilitation. The programme will also improve local capacity in planning and implementing water investment projects, improving quality standards, procurement processes and environmental sustainability.

Aspects environnementaux
Passation des marchés

The project will generally benefit the environment and public health, either by providing better drinking water to the population, improving the efficiency of the treatment and distribution facilities, or by collecting and cleaning wastewater before discharging into receiving waters. As an EU candidate country, the project will support North Macedonia's process for gradual compliance with EU standards and regulations on water, sanitation and the environment, and will provide the base for a possible accession agreement in the environmental chapter. Compliance with national Environmental Impact Assessment (EIA) legislation that has been drafted by transposing EU EIA Directive 85/337/EEC, amended by directives 97/11/EC and 2003/35/EC will be verified during the appraisal. With regards to regulations concerning the protection of habitats, respective EU Directives (92/43/EEC and 79/409/EEC) are considered to be transposed, subject to verification during the appraisal. North Macedonia is part of the international Emerald network, and procedures for compliance herewith will also be verified. The project will also help to meet national river quality objective (RQO) improvement targets set by the national Environmental Authority in line with the EU Water Framework Directive (2000/60/EC).

The Bank will require the Promoter to ensure that any procurement procedures are done in accordance with the Bank's Guide to Procurement and the relevant applicable EU public procurement rules.

Under Global Europe NDICI guarantee

Under EFSD+ Guarantee

Lien vers la source

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Documents

Fiche technique sur les aspects sociaux et environnementaux - MUNICIPAL WATER INFRASTRUCTURE NORTH MACEDONIA
Date de publication
11 Jun 2022
Langue
Sujet général
Prêts
Numéro du document
123959174
Thématique du document
Information Environnementale
Numéro du projet
20180837
Secteur(s)
Disponible au public
Télécharger maintenant

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes