300.000.000 €
Länder
Sektor(en)
Brasilien : 300.000.000 €
Energie : 300.000.000 €
Unterzeichnungsdatum
3/07/2025 : 300.000.000 €
Link zum projekt

Übersicht

Veröffentlichungsdatum
17 Juli 2025
Projektstatus
Referenz
Unterzeichnet | 03/07/2025
20230454
Projekttitel
Projektträger – Finanzintermediär
NEOENERGIA ELECTRICITY DISTRIBUTION III
COMPANHIA DE ELETRICIDADE DO ESTADO
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Gesamtkosten (voraussichtlicher Betrag)
EUR 300 million
EUR 1156 million
Ort
Sektor(en)
Beschreibung
Ziele

The loan will support an investment programme to upgrade and expand Neoenergia Coelba's electricity distribution network, Iberdrola's subsidiary, in Bahia, Brazil. The project comprises the extension, refurbishment and modernisation of lines, substations, control and protection systems, automatisation and measures to reduce commercial losses.

The aim is to improve the reliability of the electricity distribution network in the affected areas, upgrade and expand its capacity, make it easier for new users—most likely low-income households and renewable energy producers—to connect, and reduce both technical and commercial losses..

Additionality and Impact

The Programme comprises the extension, refurbishment and modernisation of the electricity distribution grid in Brazil, improving the quality and reliability of electricity supply as well as enabling the connection of new system users, including renewable generators and low-income populations. The Brazil strategic plan PDE 2034, published by the Ministry of Mines and Energy (MME), lays out ambitious goals for energy efficiency and renewable energy over the next decade, to which this project will strongly contribute.


From a policy standpoint, the Programme is of strategic importance for EU - framed under the Global Gateway Investment Agenda -, as it strongly contributes to the objectives set forth in the Multi Annual Indicative Programme (MIP) of cooperation between the EU, as well as Latin America and the Caribbean, especially the objectives of renewable energy and green transition. It supports the Bank's lending priority objectives on Energy (Energy Networks) as well as the transversal objective on Climate Action (mitigation and adaptation).


Moreover, it strongly supports Brazil's Non Determined Contributions, in the context of the Paris Agreement.


EIB financing to the Project will contribute to addressing market failures that may result in sub-optimal investments. These include negative environmental externalities and the need to ensure security of electricity supply, which has valuable public-good attributes. The investment programme will enable the connection of new users, improve the reliability of supply and support further decarbonisation of the power mix.

The Programme contributes to the achievement of the UN 2030 Agenda in particular with contribution to several Sustainable Development Goals (5,7,8,9,10,11,13,17).


The Project's overall economic viability is expected to be above the regulated financial rate of return, thus is expected to deliver a positive broader social benefit. The promoter is an experienced utility operator of electricity distribution networks and has the necessary capacity to manage the implementation of the Project and operate the assets over the term of the loan. Overall, the Project quality and results is expected to be Very Good.


The Bank's financial contribution is considered valuable to the client, as the EIB's offering provides more flexible conditions compared to market alternatives (e.g. longer tenor and grace period).

Umweltaspekte
Auftragsvergabe

The majority of the envisaged Project schemes for the implementation of electricity distribution networks are exempt (voltage below 69 KV or a length of less than 20 Km) from the Environmental License, in accordance with CEPRAM Resolution No 4119/2010 and Decree No 18218 of 26 January 2018, amending the Regulation of Law No 10.431 of 20 December 2006. The investments are expected to be mainly in urban and sub-urban areas therefore no major environmental or social impacts are expected. Nonetheless, the EIB will assess the promoter's capacity and procedures to ensure the projects' compliance with applicable national environmental, legislation, as well as with the EIB's Environmental and Social Standards.

The promoter shall ensure that implementation of the project will be done in accordance with the EIB's Guide to Procurement. Information on awarded main suppliers/contractors for the implementation of the envisaged operation will be provided during the appraisal.

Milestone
In Prüfung
Genehmigt
Unterzeichnet
31 März 2025
3 Juli 2025
Link zum projekt
Andere Links

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Dokumente

Formblatt ökologische und soziale Aspekte - NEOENERGIA ELECTRICITY DISTRIBUTION III
Datum der Veröffentlichung
17 Jul 2025
Sprache
Bereich
Finanzierung
Nummer des Dokuments
226591664
Thema
Umweltinformationen
Projektnummer
20230454
Sektor(en)
Länder
Öffentlich zugänglich
Jetzt herunterladen

Allgemeine Fragen und Anmerkungen

Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträger, sich konstruktiv einzubringen.
Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

Medienanfragen

Medienanfragen können Sie an die Pressestelle der EIB. Bitte besuchen Sie auch unseren Pressebereich.

Beschwerdeverfahren

Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht das Beschwerdeverfahren der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

„Null Toleranz“ gegenüber Betrug und Korruption

Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und der Betrugsbekämpfungspolitik behandelt.

Weitere Veröffentlichungen