Link zum projekt
Datenblätter
Andere Links
Übersicht
Veröffentlichungsdatum
17 Februar 2005
Projektstatus
Referenz
Unterzeichnet | 27/12/2005
20010413
Projekttitel
Projektträger – Finanzintermediär
Railways Rehabilitation Project on Corridor IV
Compania Nationala de Cai Ferate – CFR - SA
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Gesamtkosten (voraussichtlicher Betrag)
EUR 300 million.
EUR 850 million.
Beschreibung
Ziele
The project includes the rehabilitation and modernization of the 184 km railway line from Curtici to Simeria, along Pan-European Transport Corridor IV, to reach maximum speeds of 160 km/h.
- sustainable mobility along the Corridor IV,
- increased travel speeds,
- reduced travel time for passengers and goods,
- increased transport safety,
- increased inter-operability with EU standards.
Umweltaspekte
Auftragsvergabe
The majority of the works will be on the existing railway right-of way and will not require particular environmental studies. However, the station refurbishments and the section of re-alignment will be subject to national and EU environmental regulations and requirements.
Procurement will be undertaken in line with the EIB Guide to Procurement.
Link zum projekt
Andere Links
Datenblätter
Zugehörige Pressemitteilungen
Aktuelles und Storys
Link zum projekt
Andere Links