    Referenz: 20230560
    Veröffentlichungsdatum: 26 August 2024

    Projektträger – zwischengeschaltetes Finanzinstitut

    SCHIPHOL NEDERLAND BV

    Ort

    Beschreibung

    The project consists of the upgrade of the passenger security screening equipment and baggage handling system (BHS) at Schiphol Amsterdam airport. Works consist of: i) the implementation of last generation body and hand luggage screening equipment, ii) the phasing out of the existing D-pier baggage hall, and iii) replacing it with the "South BHS" baggage basement, which will be a state-of-the-art fully automated and robotised baggage handling system. It will ensure operational resilience by providing the necessary redundancy to overhaul, upgrade and further automate the airport's passenger screening and hold baggage handling system. The new equipment will improve passenger comfort, increase level of service, operational reliability and working conditions through full automation of the baggage handling process.

    Ziele

    The project upgrades and further automates the airport's operational capacity, and improves operational reliability and working conditions. Furthermore, it applies the highest standards for security and screening and thus contributes to safety.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 400 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 1100 million

    Umweltaspekte

    The scope of works of the project is not expected to fall under Annexes I or II of the EIA Directive 2011/92/EU as amended by Directive 2014/52/EU and therefore screening decisions by competent authorities are not expected. The project is expected to contribute to climate action and environmental sustainability objectives, in particular to climate mitigation, pollution prevention and control.

    Auftragsvergabe

    The EIB will require the promoter to ensure that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/25/EU, where applicable, as well as Directive 92/13/EEC and Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Projektstatus

    In Prüfung - 10/04/2024

    Milestone
    In Prüfung

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Niederlande Verkehr