    24 April 2024
    Projektstatus
    Referenz
    Genehmigt | 16/10/2024
    20230222
    Projekttitel
    Projektträger – Finanzintermediär
    GUYANA WATER
    CARIBBEAN DEVELOPMENT BANK,COOPERATIVE REPUBLIC OF GUYANA,GUYANA WATER INC
    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
    Gesamtkosten (voraussichtlicher Betrag)
    USD 27 million (EUR 24 million)
    USD 89 million (EUR 82 million)
    Ort
    Sektor(en)
    • Wasser, Abwasser - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen
    Beschreibung
    Ziele

    The project will finance the improvement of the water supply services in four regions of Guyana, such as the construction of new wells, five new water treatment plants, new transmission lines, service connections and metering systems in the regions. The Caribbean Development Bank (CDB) will be EIB borrower/financial intermediary for this operation. CDB will on-lend EIB resources to the Government of Guyana for the purpose of financing the project. The execution agency and promoter, as mentioned above, will be Guyana Water Incorporated (GWI), a public limited company created under the 2002 Water and Sewerage Act of Guyana and the main drinking water supplier of the country. This is an allocation under EIB project 2016-0150 CDB Climate Action Framework Loan II.

    The project has two main goals: (i) to increase the availability and accessibility (water security) to treated water for the population within 5 coastal communities (Walton Hall to Charity, Wakeman, Leguan Island, Bush Lot and Tain to N50 Village), through new and upgraded water supply infrastructure; (ii) to improve the water quality by reducing contaminants such as iron. The project aims at complying with World Health Organization's (WHO) water quality guidelines in the water supply systems. It also complies with the studies carried out in relation to the Guyana's Coastal Aquifer Management System (Groundwater Management 2020 - 2030; Coastal Aquifers Guyana / GWI 2020). The project is in line with the Integrated Water Supply and Sanitation sector policy (IWSS), prepared by the Government of Guyana and the project promoter.

    Umweltaspekte
    Auftragsvergabe

    Due to the nature of the works to be implemented, the negative environmental impacts are expected to only occur in the construction period and mainly locally based, temporary and reversible (e.g. minor disturbance due to pipe replacement techniques). Such temporary negative effects are assessed as not having any measurable and residual environmental effects and they will be mitigated with appropriate measures, in line with the promoter's Environmental and Social Management and Monitoring Plans. The project investments are overall expected to have positive long-term effects on the environment as they ensure a more efficient and sustainable use of groundwater resources.

    The promoter will be responsible to carry out all procurement related to the project. The promoter is a public authority as defined in the EIB's Guide to Procurement (GtP) and the public procurement regime will be applicable to the project components. The EIB-CDB Procedural Framework (PF) in respect of mutual reliance for jointly co-financed public sector projects in common countries of operation was signed in October 2019. The PF concludes that EIB and CDB share the same public procurement principles of economy, efficiency, transparency, non-discrimination and accountability and that, in practice, the general principles and key features of a sound procurement process supported by the two parties can be considered broadly equivalent for all aspects of procurement. Under such PF, CDB will support the promoter and monitor the procurement processes. The procurement processes above the EIB's Guide to Procurement thresholds will be published in the Official Journal of the EU.

    Phase
    Genehmigt
    16 Oktober 2024
    Projekte zum thema
    Übergeordnetes Projekt

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Dokumente

    Formblatt ökologische und soziale Aspekte - GUYANA WATER
    Datum der Veröffentlichung
    18 Oct 2024
    Sprache
    Bereich
    Finanzierung
    Nummer des Dokuments
    182680364
    Thema
    Umweltinformationen
    Projektnummer
    20230222
    Sektor(en)
    Länder
    Öffentlich zugänglich
    Jetzt herunterladen
    Andere Links
    Übersicht
    Übergeordnetes Projekt

    Allgemeine Fragen und Anmerkungen

    Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträger, sich konstruktiv einzubringen.
    Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
    Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
    Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

    Medienanfragen

    Medienanfragen können Sie an die Pressestelle der EIB. Bitte besuchen Sie auch unseren Pressebereich.

    Beschwerdeverfahren

    Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht das Beschwerdeverfahren der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

    „Null Toleranz“ gegenüber Betrug und Korruption

    Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und der Betrugsbekämpfungspolitik behandelt.

    Weitere Veröffentlichungen