Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20190576
Veröffentlichungsdatum: 10 Oktober 2019

Projektträger – zwischengeschaltetes Finanzinstitut

NEOENERGIA SA

Ort

Beschreibung

The project consists of a Framework Loan to finance renewable energy projects in Brazil, promoted by Neoenergia.

Ziele

The project is expected to contribute to the External Lending Mandate 2014-2020 objectives including climate change mitigation. The operation is well aligned with the United Nations Sustainable Development Goals 7 ("ensure access to affordable, reliable, sustainable and modern energy for all") and 13 ("take urgent action to combat climate change and its impacts"). The operation will also contribute to the EIB's priority objectives for energy sector lending related to renewable energy sources, in line with the EIB's Energy Lending Criteria and its Climate Action objectives.

Sektor(en)

Garantie im Rahmen des Außenmandats

This operation is covered by the ELM Political Risk Guarantee.

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 250 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 500 million

Umweltaspekte

If the plants were located within the EU they would fall under Annex II of the Environmental Impact Assessment (EIA)Directive (2014/52/EU amending the 2011/92/EU), requiring the competent authorities to determine whether an EIA is required. The capability of the Promoter to comply with the EIB's Environmental and Social standards will be assessed as part of the appraisal of the framework loan. The authorization procedure of each scheme and its compliance with the EIB's Environmental and Social standards and the principles of relevant EU Directives, will be verified at the appraisal of the individual schemes.

Auftragsvergabe

It is required that the promoter to ensure that implementation of the project will be done in accordance with the EIB's Guide to Procurement. The EIB will not finance plants for which the procurement process is impacted by local content requirements non-compliant with the above mentioned Guide to Procurement.

Projektstatus

Unterzeichnet - 4/12/2019

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Brasilien Energie