Referenz: 20190547
Veröffentlichungsdatum: 3 Dezember 2024

Projektträger – zwischengeschaltetes Finanzinstitut

COMUNIDAD AUTONOMA DE ANDALUCIA

Ort

Beschreibung

The project concerns the railway installations (power supply, signalling, passenger's information systems and telecommunications), plus the architectural works for the 12 tramway stops, the new depot and the necessary rolling stock (6 tram sets, of 5 carriageways each). It is important to note is that the civil works and the track works for this future tramway line are already built.

Ziele

The project supports investments in sustainable urban public transport (new tram line), which are expected to reduce transport externalities such as air pollution and greenhouse gas emissions, decrease travel times for the tramway users as well as road traffic congestion in the area, by promoting modal shift from private car users to public transport. In addition, being fully located within a less developed region of the EU, the project supports the strengthening of the EU's economic, social and territorial cohesion.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 41 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 130 million

Umweltaspekte

The project, to be appraised and monitored in line with the EIB's policies, including the Environmental and Social Sustainability Framework, will contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate mitigation. Project falls within the projects listed in Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU, amended by EIA Directive 2014/52/EU. A formal EIA was prepared for the project and following with that, after the public consultation process, the environmental Competent Authority issued the environmental permit. Therefore, during appraisal, the EIB will check the compliance with the requirements of the Directive 2011/92/EU, amended by EIA Directive 2014/52/EU. Additionally, and as applicable, the EIB will review compliance with the Strategic Environmental Assessment (SEA) Directive 2001/42/EC and the relevant Habitats and Birds Directives (92/43/EEC and 2009/147/EC, respectively).

Auftragsvergabe

The promoter has to ensure that contracts for implementation of the Project will be tendered in accordance with the applicable EU procurement legislation, Directive 2014/24/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Projektstatus

Genehmigt - 4/02/2025

Milestone
Genehmigt
4 Februar 2025

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Spanien Verkehr