Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20190180
    Veröffentlichungsdatum: 13 September 2019

    Projektträger – zwischengeschaltetes Finanzinstitut

    LANDKREIS HAMELN-PYRMONT

    Ort

    Beschreibung

    The project is a new allocation under the framework loan "Breitband Niedersachsen" (2014-0404). It concerns the roll-out of a passive optical fibre access network (Fibre-To-The-Building or FTTB). By 2022, the network will provide advanced broadband services up to 1 Gbps to about 14 000 households and businesses located today in uncovered white spots.

    Ziele

    The project contributes to the goal of the Gigabit society to provide access to all rural households to Internet connectivity, offering a bandwidth of at least 100 Mbps, upgradable to Gigabit by 2025. Furthermore, it supports the objective of the Electronic Communication Code to promote connectivity and access to, and take-up of, very high capacity networks, by all citizens and businesses.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 29 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 58 million

    Umweltaspekte

    Investments in fixed telecommunications projects (mainly civil works for fibre roll-out) do not fall under the Environmental Impact Assessment (EIA) Directive 2011/92/EU amended by 2014/52/EU. The related works have limited environmental effects, apart from disturbances during the construction phase, which can be mitigated by appropriate measures.

    Auftragsvergabe

    The Bank will require the promoter to ensure that contracts for the implementation of the project are tendered in accordance with the relevant applicable EU procurement legislation (Directives 2014/23/EC and/or 2014/24/EC, where applicable as well as Directive 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Projektstatus

    Genehmigt - 25/10/2019

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Deutschland Telekommunikation