Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20150148
    Veröffentlichungsdatum: 8 Juli 2015

    Projektträger – zwischengeschaltetes Finanzinstitut

    CITY OF RZESZOW

    Ort

    Beschreibung

    Co-financing of investments included in the investment plans of the City of Rzeszow primarily focused on roads and urban infrastructure (public transport, education, energy efficiency, water and waste water, sport facilities, culture).

    Ziele

    The multi-sector sub-projects/schemes to be financed are expected to contribute to the implementation of the development strategy of Rzeszow which is being updated for 2015-2025 period. The city is located within a region (Podkarpackie Voivodeship NUTS II Region) classified by the EU as a less-developed region in the 2014-2020 programming period and thus eligible for the Bank under the EIB Cohesion Priority Regions objective.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    PLN 400 million (EUR 95 million)

    Gesamtkosten (voraussichtlicher Betrag)

    PLN 2000 million (EUR 473 million)

    Umweltaspekte

    Some of the schemes might fall under Annex I or Annex II of Directive 2011/92/EC on environmental impact assessment (EIA). If any scheme had a negative impact on an area forming part of the Natura 2000 network (falling under Habitats Directive 92/43/EEC or Birds Directive 79/409/EEC) the Bank would require the promoter to act according to the provisions of the aforementioned directives as transposed into national law.

    Auftragsvergabe

    The promoter, as a public administration entity, is required to follow EU public procurement rules (2004/17/EC and 2007/18/EC) including publication of contract notices in the EU Official Journal as implemented by national law, if and where appropriate.

    Projektstatus

    Unterzeichnet - 17/12/2015

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Polen Stadtentwicklung Verkehr