    Referenz: 20110429
    Veröffentlichungsdatum: 20 April 2012

    Projektträger – zwischengeschaltetes Finanzinstitut

    PKP INTERCITY

    Ort

    Beschreibung

    Renewal of PKP Intercity rolling stock including purchase of 30 new trains (double-deckers) to be used on Warsaw-Lodz line and 25 coaches to be used on the line from Wroclaw - Poznan - Bydgoszcz - Gdynia (E-59 line), modernisation of 68 trains to be used on lines E-30 and E-59 on the connection from Przemysl to Szczecin.

    Ziele

    Supporting public transport with the renewal of rolling stock of the national long distance passenger rail operator including: (i) the purchase of 30 new double decker carriages for use on the Warsaw Lodz line under the low cost TLK brand; (ii) the purchase of 25 carriages to be used on E59 (Wroclaw, Poznan, Bydgoszcz, Gdynia); and (iii) the modernisation of 68 carriages to be used on Przemysl to Szczecin.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    PLN 186 million (EUR 46 million)

    Gesamtkosten (voraussichtlicher Betrag)

    PLN 465 million (EUR 116 million)

    Umweltaspekte

    The investments proposed under the project do not fall under either Annex I or Annex II of the Environmental Impact Assessment Directive 85/337/EEC as refurbishment/manufacturing and use of rail rolling stock is not included in either list. All else equal, the project is expected to have a positive environmental impact by helping the railways to maintain modal share in key sections of the passenger market that are most appropriately met by rail.

    Auftragsvergabe

    The promoter is a contracting authority governed by public law and is subject to provisions of Directive 2004/17/EC as transposed through Polish Public Procurement Law. The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the Directive, with parallel publication of tender notices in the EU Official Journal, as and where appropriate.

    Projektstatus

    Unterzeichnet - 19/12/2013

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Polen Verkehr