Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20100636
    Veröffentlichungsdatum: 7 März 2013

    Projektträger – zwischengeschaltetes Finanzinstitut

    Hungary represented by the National Development Agency

    Ort

    Beschreibung

    The project comprises the rehabilitation of 43 km wide-gauge main railway track system and the hauling tracks in region of Záhony area in Hungary as well as the rehabilitation of other tracks in Eperjeske marshalling yard and the rehabilitation of the relating signalling equipment, including the corresponding power supply, outdoor lighting, telecommunication and switch heating works.

    Ziele

    The project is related to the European Agreement on Main International Railway lines (AGC) and in particular to the European agreement on important international combined transport lines and related installations (AGTC). Rehabilitation of the line will eliminate speed limited sections along the route. This will increase freight transport as well as intermodal flow of goods received on international routes, including extra-Community routes. Volume of goods transported by rail within the internal market will also grow.

    Kommentar(e)

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 10 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 72 million

    Umweltaspekte

    A strategic environmental assessment was prepared for the Záhony region in 2007. The project falls under Annex II of the EIA Directive and was screened out by the Competent Authority on the basis of the preliminary environmental impact study carried out. The Competent Authority also confirmed that the project will not have any significant impact on declared Natura 2000 sites.Compliance with environmental legislations will be verified during appraisal.

    Auftragsvergabe

    The Promoter is subject to and follows EU Directives on procurement procedures (in this particular case, Directive 2004/18/EC), including publication in the Official Journal of the European Union (OJEU), that have been transposed into national legislation. All contracts over the relevant EC directive thresholds have been put out to international tendering, with publication of notices in the OJEU. The procurement process will be verified during appraisal.

    Projektstatus

    Genehmigt - 26/10/2012

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Ungarn Verkehr