Referenz: 20090517
Veröffentlichungsdatum: 16 November 2009

Projektträger – zwischengeschaltetes Finanzinstitut

The promoter of the project is the Hungarian Transmission System Operator Ltd. ("MAVIR"), a fully owned subsidiary of the state-controlled MVM Group, the leading energy group of Hungary.

Ort

Beschreibung

The project consists of 7 project schemes aimed at reinforcing and extending the Hungarian electricity transmission network over the period 2010-2015. The project includes the upgrade of the transmission corridor Martonvásár-Bicske-Györ and six new/extended substations situated in dispersed locations over the Hungarian territory.

Ziele

The project will promote the development of the electricity transmission network in Hungary and will be entirely implemented in areas designated as convergence regions. It will improve security and diversification of supply through the construction of additional internal transmission capacity.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 150 million

Gesamtkosten (voraussichtlicher Betrag)

Estimated at EUR 311 million

Umweltaspekte

The project scheme involving the upgrade the transmission corridor Martonvásár-Bicske-Györ falls under Annex I of the EIA Directive and requires an EIA, while the remainder project schemes for construction/extension of substations fall under Annex II, leaving it to the national competent authority to decide whether an EIA would be required in line with the screening criteria specified in the directive. The environmental impacts that can be typically expected for the project schemes relate to visual impact, vegetation clearance, electromagnetic fields, noise nuisance and disturbance during construction.

Auftragsvergabe

The details of the procurement procedures followed for the project schemes and their compliance with the EU Directive on public procurement will be investigated during appraisal.

Projektstatus

Unterzeichnet - 30/04/2010

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Ungarn Energie