    Referenz: 20090170
    Veröffentlichungsdatum: 17 Juni 2009

    Projektträger – zwischengeschaltetes Finanzinstitut

    To be defined at a later stage.

    Ort

    Beschreibung

    The project consists of a cross-border railway tunnel of approximately 55.5 km crossing the Alps between Innsbruck (Austria) and Fortezza (Italy) to be used for freight and high speed passenger transport. The project in a wider sense also will have to comprise the implementation of major additional infrastructures on both its northern and southern access routes between Munich and Verona.

    Ziele

    The project will provide a shorter and more efficient alternative to the existing (above ground-level) pass route and should lead to a modal shift from road to rail.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 1.8 billion.

    Gesamtkosten (voraussichtlicher Betrag)

    An estimate of total project cost will be provided at a later stage.

    Umweltaspekte

    The project falls under Annex 1 of the EU Directive 85/337/EEC. Compliance with all applicable EU and national environmental legislation on environment will be verified during appraisal, with particular focus on the following:

    • SEA (Strategic Environmental Assessment), in accordance with EU Directive 2001/42;
    • EIA (Environmental Impact Assessment), in accordance with Directive 85/337/EEC (and following amendments Directive 97/11/EC and 2003/35/E);
    • Nature Conservation, in accordance with EU Habitat Directive 92/43/EEC (especially Articles 6, 10 and 12) and EU Birds Directive 74/409/EEC.

    Auftragsvergabe

    The Bank will require the Promoter to ensure that the contracts related to the project have been or shall be tendered in accordance with EU public procurement procedures.

    Projektstatus

    In Prüfung - 17/06/2009

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Italien Verkehr