Veröffentlichungsdatum: 16 Juni 2009
Projektträger – zwischengeschaltetes Finanzinstitut
City of Sofia
Ort
Beschreibung
Rehabilitation of three of the main traffic nodes of Sofia’s road network.
Ziele
Improvement of the quality of circulation and road safety.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Up to EUR 35 million.
Gesamtkosten (voraussichtlicher Betrag)
Up to EUR 70 million.
Umweltaspekte
As a Member State, Bulgaria has harmonised its environmental legislation in line with the relevant EU Directives (85/337/EC, as amended, and 2001/42/EC). The schemes would most likely fall outside both Annex I and II of the EU EIA Directive, however this screening will be performed by the Competent Authority on a case-by-case basis. Details on each scheme will be checked at appraisal stage, when the relevant specific information is available and can be analysed.
Auftragsvergabe
The promoter is a public entity subject to EU Public Procurement rules. EU Directives (2004/18/EC and 2004/17/EC) have been transposed into national legislation. Tenders will be/have been organised in compliance with EU requirements, with publication of tender notices in the EU Official Journal for projects above thresholds. Procurement procedures are therefore satisfactory to the Bank.
Projektstatus
Unterzeichnet - 22/10/2009
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).