    Referenz: 20080728
    Veröffentlichungsdatum: 6 November 2009

    Projektträger – zwischengeschaltetes Finanzinstitut

    EDP – Energias de Portugal S.A.

    Ort

    Beschreibung

    The project concerns the re-powering of 2 existing pumped storage hydropower plants, the Alqueva plant on the Guadiana River, in the Southeast of Portugal and the Venda Nova plant on the Cávado River in the North of Portugal.

    Ziele

    The proposed project aims at increasing the promoter’s hydropower peaking capacity and its ability to supply ancillary services. Both plants will generate energy during peak hours and their installed capacity can be used as fast secondary reserve. These projects also contribute to the sustained growth of the wind energy in the national electricity system.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    Estimated up to EUR 260 million.

    Gesamtkosten (voraussichtlicher Betrag)

    Estimated at EUR 520 million.

    Umweltaspekte

    An EIA is required for both plants. For the Alqueva plant, the EIA has been finalized and an environmental permit has been issued. For the Venda Nova plant, the EIA process is ongoing. At this stage, the promoter has provided the Bank with a copy of the Non Technical Summaries for both plants and the Environmental Permit for the Alqueva plant. The permit approves the project, conditional on the implementation of the mitigation measures and the environmental monitoring plan identified in the EIA. Both projects being re-powering projects, the main impacts are limited to the construction period with some permanent impact expected on the landscape due to the presence of new buildings, some rock debris deposits and new transmission lines.

    In line with the Bank's guidelines, details of the environmental impact assessment, including adequacy of proposed mitigation, compensation and environmental monitoring will be analysed during appraisal, as well as the promoter's capacity and procedures to ensure compliance with environmental and biodiversity regulations.

    Auftragsvergabe

    The promoter has confirmed to comply with the EU procurement Directives, including publication in the Official Journal. Details of the procedures applied by the promoter will be reviewed during the appraisal.

    Projektstatus

    Unterzeichnet - 11/01/2011

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Portugal Energie