Veröffentlichungsdatum: 12 Mai 2009
Projektträger – zwischengeschaltetes Finanzinstitut
Philips Lighting Maseru (Pty) LtdOrt
Beschreibung
Operation of a manufacturing plant in Lesotho aimed at producing energy saving fluorescent lamps for the Southern African market (including recycling).
Ziele
To produce energy efficient lamps in order to assist the South-African Government with the role-out of its Energy Demand Side Management Initiative. The project will create 500 jobs, and will be one of the first FDI helping the Lesotho economy to diversify its industrial structure away from the footloose textile industry.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 5 million.
Gesamtkosten (voraussichtlicher Betrag)
EUR 7.6 million.
Umweltaspekte
The production activities will be carried in a building rented from the Lesotho National Development Company, for which the competent authority has decided that an EIA is necessary. The owner of the building has prepared a full EIA which is currently under public consultation and of which the bank has received a copy. The promoter has prepared, as requested by the local authorities, an Environmental Management Plan which has already been submitted to the competent authorities. Positive conclusions of the EIA with necessary supporting documentation by the competent Authority and of the EMP remain conditional for disbursement of the loan.
Auftragsvergabe
The promoter is a private company operating in a competitive manufacturing sector not covered by EU Directives on procurement.
Projektstatus
Unterzeichnet - 27/07/2010
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).