    Referenz: 20080052
    Veröffentlichungsdatum: 11 April 2008

    Projektträger – zwischengeschaltetes Finanzinstitut

    The promoter is engaged in the exploration, production, refining and distribution of petroleum products, the supply and distribution of natural gas and the generation of electric and thermal energy.

    Ort

    Beschreibung

    The project involves the studies, design, construction, commissioning and operation of a natural gas fired industrial cogeneration plant located on the premises of a refinery. The cogeneration plant of 82 MW will satisfy the process steam and electricity demand of the refinery’s processing facilities. Surplus electricity can be exported to the national high voltage network. The plant will produce some 670 GWh of electricity and 2.2 million ton of steam per year.

    Ziele

    Replacement of existing heavy fuel-oil fired power and heat generators to raise the efficiency of the energy conversion and achieve compliance with the Large Combustion Plant Directive by reducing emissions of SO2, NOx and particulates.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    Up to 50% of the project cost.

    Gesamtkosten (voraussichtlicher Betrag)

    To be determined.

    Umweltaspekte

    The EIA has been carried out for the project in 2007. The study did not find impacts that are unacceptable or that cannot be mitigated appropriately. Fuel switch from heavy oil to gas and deployment of highly energy efficient conversion technology will result in lower specific CO2 emissions from the planned installation in relation to the existing situation.

    Auftragsvergabe

    A “Notice of the existence of a qualification system” concerning the cogeneration project in the Porto refinery has been published in OJEC 2007/S 133-163800 on 13/07/2007.

    Projektstatus

    Unterzeichnet - 15/10/2008

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).