Veröffentlichungsdatum: 20 Februar 2008
Projektträger – zwischengeschaltetes Finanzinstitut
Ministry of Transport and Communication of the Federation of Bosnia and Herzegovina
Ort
Beschreibung
The project concerns the construction of two motorway sections on Corridor Vc :
- Vlakovo - Tarcin, South of Sarajevo, in a length of 19 km
- Svilaj - Odzak, in a length of 9 km, at the Northern border with Croatia, including a bridge across the Sava river, the border between BiH and Croatia
Ziele
The project will significantly increase accessibility and reduce travel times, thereby contributing to a balanced economic development of the regions concerned. Current average speeds on existing road are estimated at some 50 km/h and these should rise to 120 km/h with the new infrastructure. Commuting among main cities and towns along the corridor will be much faster and more comfortable.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Up to EUR 166 million
Gesamtkosten (voraussichtlicher Betrag)
About EUR 340 million
Umweltaspekte
This type of project (construction of a motorway) falls under Annex I of EU Directive 85/337/EEC as amended by Directive 97/11/EC and thus requires a full EIA.
Auftragsvergabe
The Bank will require the promoter to ensure that implementation of the project will be done in compliance with the Bank’s Guide to Procurement and applicable EU rules.
Projektstatus
Unterzeichnet - 22/08/2012
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).