Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20070413
    Veröffentlichungsdatum: 27 November 2007

    Projektträger – zwischengeschaltetes Finanzinstitut

    SMAT – Società Metropolitana Acque Torino S.p.A.

    Ort

    Beschreibung

    The operation concerns two underground water supply pipelines: (i) one supplying 27 municipalities in the Val di Susa (length: 66.7 km; diameter 700 mm) with surface water from an existing dam; (ii) the other one supplying the city of Turin from an existing well field (length: 11.8 km, diameter 1,600 mm), substituting an existing pipeline of 1928.

    Ziele

    To improve the quality, reliability and cost-effectiveness of water supply in the Province of Turin.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 80.00 million.

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 160.00 million.

    Umweltaspekte

    The purpose of the project is compliance with the environmental water quality and service standards set by the EC directives (e.g. EU Drinking Water Directive 98/83/EC).The requirements of the Environmental Impact Assessment (EIA) Directive 97/11/EC, as amended by Directive 2003/35/EC, will be respected. For any works that may impact on a nature conservation site, the promoter will be required to comply with the Habitats Directive.

    Auftragsvergabe

    As a company performing a public service, and as recalled in the Concession contract, SMAT must follow national and EU procurement laws for any works and services contracts. The Bank will require from the promoter that contracts for the implementation of the project have been or shall be tendered in accordance with relevant applicable EU procurement laws (Dir 93/38, 2004/17/EEC), with publication of tender notices in the EU Official Journal, as and where appropriate.

    Projektstatus

    Unterzeichnet - 27/06/2008

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Italien Wasser, Abwasser