    Referenz: 20070296
    Veröffentlichungsdatum: 18 September 2007

    Projektträger – zwischengeschaltetes Finanzinstitut

    Katoen Natie Group

    Ort

    Beschreibung

    The project consists of the expansion of the existing container terminal being operated under a concession scheme at the port of Montevideo.

    Ziele

    Contribute to i) support EU presence in Latin America through Foreign Direct Investment,
    ii) the economic development of Uruguay and
    iii) allow the transfer of European technology and know-how.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    Up to EUR 40 million.

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 82 million.

    Umweltaspekte

    If within the EU the Project would fall under Annex I of the EU Directive 97/11 and would require an EIA. On 11 August 2004, the Uruguayan Environmental Authority (DINAMA) classified the project in the “C” category, requiring the preparation of a full EIA. An EIS was carried out and submitted to DINAMA on 6 December 2004, complemented in 2005 by an archeological impact study. A public hearing was conducted in 2005. The environmental authorization was granted by DINAMA on 23 October 2006, and required the close monitoring of dredging and sand extraction works. During appraisal the Bank will ensure that both the final EIA and the proposed mitigating measures comply with the principles of EU environment policies and with national requirements.

    Auftragsvergabe

    Following the 1992 Free Port Law, the Government initiated the process of giving into concession the container terminal of Montevideo. The process was concluded in July 2001 by a public auction procedure, resulting in the sale of 80% of TCP’s capital to the Promoter and its local partners. The appraisal mission will meet ANP in order to obtain confirmation that the procedure followed by the Government of Uruguay was in line with the principles of EU procurement procedures.

    Projektstatus

    Unterzeichnet - 7/12/2007

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Uruguay Verkehr