    Referenz: 20070095
    Veröffentlichungsdatum: 21 Februar 2008

    Projektträger – zwischengeschaltetes Finanzinstitut

    T.E.R.NA. – Trasmissione Elettricità Rete Nazionale S.p.A., the transmission system operator in Italy and the owner of the National Transmission Grid (NTG) for high voltage electricity.

    Ort

    Beschreibung

    The project concerns the design, construction and operation of a new submarine high voltage direct current electricity cable link between the Italian mainland and Sardinia with a capacity of 1,000 MW and a total submarine section length of 420 km, plus two short land sections and two converter stations.

    Ziele

    The project will help to export excess power from future wind farms and possibly from thermal power plants from Sardinia for meeting growing electricity demand in mainland Italy, and maintain/improve the reliability of the grid supply system on Sardinia, one of Italy’s less developed regions.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 300 million

    Gesamtkosten (voraussichtlicher Betrag)

    Indicatively EUR 700 million

    Umweltaspekte

    The project does not fall under the EU EIA Directive since it concerns a submarine/underground cable. The promoter submitted a detailed Environmental Impact Assessment report covering in particular the aspects of installation of the submarine cable and its possible effects on marine life. The competent authorities, comprising national and regional bodies, having examined the environmental impact study provided by the promoter, confirmed the environmental compatibility of the planned installation imposing a number of detailed mitigating measures to be taken during construction and operation.

    Auftragsvergabe

    The promoter is subject to the requirements of the EU Procurement Directive 93/38/EC (as amended by 2004/17/EC) and plans to let a further series of contracts via OJ publication; three contracts have already been let via OJ publication.

    Projektstatus

    Unterzeichnet - 5/05/2008

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Italien Energie