Veröffentlichungsdatum: 27 April 2006
Projektträger – zwischengeschaltetes Finanzinstitut
Druzba za Avtoceste v Republiki Sloveniji d.d. (DARS)
Ulica XIV. divizije 4
SI-3000 Celje
Ort
Beschreibung
The project concerns the construction of five new motorway sections. The sections concerned are
- Sentvid-Koseze (5.500km);
- Vrba-Peracica (9.780km);
- Ponikve-Hrastje (7.165km);
- Pluska-Ponikve (7.597km) and
- Slivnica-Drazenci (19.850km).
The total length of the road sections is approximately 50 km. All sections are located on the Trans-European Road Network (TEN-T) in Slovenia.
Ziele
Completion of the Highway network in Slovenia
Kommentar(e)
Motorways.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Up to EUR 300 million.
Gesamtkosten (voraussichtlicher Betrag)
EUR 600 million.
Umweltaspekte
All schemes financed under the proposed project will be required to comply with the relevant national legal framework, to be acceptable in environmental terms to EIB and in line with EU environmental policy.
Auftragsvergabe
All the contracts to be financed by the Bank will be advertised in the EU Official Journal and open on equal terms to international competition in accordance with the Bank's procurement criteria.
Projektstatus
Unterzeichnet - 18/12/2006
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).