Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20050620
    Veröffentlichungsdatum: 19 Juli 2006

    Projektträger – zwischengeschaltetes Finanzinstitut

    The Greek State, represented by the Ministry of Environment, Physical Planning and Public Works (Ministry).

    Ort

    Beschreibung

    The proposed project consists of the construction of approximately 100 km of new 2x2 lane motorway sections linking Tripoli to Kalamata and a section from Lefktro to Sparti in the Peloponnese region under a DBFO scheme. It also includes the existing motorway section from Korinthos to Tripoli as well as additional new sections built by the Greek State. The 205 km motorway, from Korinthos to Kalamata (159 km) and from Lefktro to Sparti (46 km), will be operated and maintained under a 30-year concession. All sections are located on the Trans-European Road Network (TEN-T) in Greece.

    Ziele

    The project will deliver a high quality route offering an improved service for users capable of accommodating significantly increased traffic volumes leading to reductions in travel times, road accidents and vehicle-operating costs. The upgraded road network connecting the remote and less developed areas of southern Peloponnese with the Athens Metropolitan area and the rest of the country is expected to further develop economic opportunities in the wider region whilst significantly increasing the level of safety along the existing routes and contributing to the improvement of the environmental conditions within local communities and the region, in general.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    Approx. EUR 200 million.

    Gesamtkosten (voraussichtlicher Betrag)

    Estimated at approx. EUR 1,100 million.

    Umweltaspekte

    The project is subject to an Environmental Impact Assessment (EIA) in accordance with national legislation (the project falls under Annex I of the EU Directive 97/11/EC). The project might as well fall under the Strategic Environmental Assessment Directive. The environmental aspects of the project will be further investigated, if and where necessary.

    Auftragsvergabe

    In May 2006, following an international tender, the Greek State selected a preferred bidder and there has been no complaint lodged against the procurement procedure. Further tender notices, if any, comprising contracts for the implementation of the project are or will be published according to the relevant applicable EU procurement legislation. The procurement process and current status will be further reviewed during appraisal (if and where necessary).

    Projektstatus

    Unterzeichnet - 31/01/2007

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Griechenland Verkehr