    Referenz: 20050188
    Veröffentlichungsdatum: 12 Juli 2005

    Projektträger – zwischengeschaltetes Finanzinstitut

    Piraeus Port Authority S.A.

    Ort

    Beschreibung

    The project comprises the extension of an existing pier and back-up area, plus investment in new equipment and machinery to increase capacity at the Neo Ikonio Container Terminal.

    Ziele

    Present container terminal facilities in the Piraeus Port restrict throughput to some 1.6M TEUs/year. The project is therefore necessary to further develop the role of Piraeus as an important hub in the East Mediterranean container trade and the Port’s strategic role with regard to Middle East and Black Sea traffic. The project will improve the efficiency of port operations and help to meet growing demand for container import/export and transshipment capacity.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 35 million.

    Gesamtkosten (voraussichtlicher Betrag)

    Approximately EUR 70-75 million.

    Umweltaspekte

    The project (extension of Ikonion Pier I and backup area) falls under Annex II of the EIA Directive 97/11. The Environmental aspects of the project have been studied under the Master Plan for Piraeus Port 2004-2009, and the competent environmental authority (Ministry of Environment - MoE) is reviewing the studies. The MoE has determined that no separate EIA will be required for the works at Pier I, as the project's environmental aspects are already covered by the Master Plan. The process for review of the 2004-2009 Master Plan - in particular the decision by the competent authority whether to require an EIA for this new Master Plan (there was an earlier EIA for an old Master Plan 1994-2000, which gained its approvals in 1996), the status of any public consultations, and the mitigation measures proposed and their timing, including quarry rehabilitation works, will be reviewed during appraisal. No impacts are expected on Natura 2000 areas. This will be confirmed during appraisal.

    Auftragsvergabe

    Project components have been or will be procured in accordance with applicable EU Directives on Public Procurement, with publication in EU Official Journal as required. This will be confirmed during appraisal.

    Projektstatus

    Unterzeichnet - 21/10/2005

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Griechenland Verkehr