Veröffentlichungsdatum: 30 November 2004
Projektträger – zwischengeschaltetes Finanzinstitut
Società del Patrimonio per la Mobilità Veneziana SpAOrt
Beschreibung
The project consists of the construction of two tramway lines:
- Favaro-Mestre-Venice, 14 km length.
- Mestre - Marghera, 6 km length.
It includes a depot in Favaro and the acquisition of rolling stock.
Ziele
The project aims at improving the quality of the public transport system and reducing traffic congestion in the Venice metropolitan area.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Up to EUR 54 m
Gesamtkosten (voraussichtlicher Betrag)
EUR 156 m
Umweltaspekte
During the operational phase the project is expected to reduce the environmental pollution and noise levels caused by cars and buses. To address potential environmental aspects during the construction phase, an EIA has been conducted and will be checked during appraisal.
Auftragsvergabe
The Promoter has tendered the contracts for the implementation of the project in accordance with the relevant EU procurement legislation, with parallel publication of tender notices in the EC Official Journal, as and where appropriate.
Projektstatus
Unterzeichnet - 25/05/2005
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).