Veröffentlichungsdatum: 21 Dezember 2005
Projektträger – zwischengeschaltetes Finanzinstitut
Elia System Operator SAOrt
Beschreibung
Upgrade and reinforcement of the high-voltage electricity grid in Belgium.
Ziele
By maintaining an adequate and cost-effective supply of electricity, the project would contribute to the rational use of energy and is expected to support the economic development in Belgium and its neighbouring countries.
Kommentar(e)
Electricity transmission.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Approx. EUR 125 million.
Gesamtkosten (voraussichtlicher Betrag)
Approx. EUR 270 million.
Umweltaspekte
Belgian legislation does not require an EIA for reinforcing the existing overhead transmission lines included in this project. Other project components do not fall under EIA directive.
Auftragsvergabe
The promoter has confirmed that their procurement rules are fully in line with the EU public procurement procedures (Utilities Directive 93/38/EC pending transposition of 2004/17/EC) and include publication in the OJEU.
Projektstatus
Unterzeichnet - 19/12/2005