Suche starten De menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20040378
Veröffentlichungsdatum: 4 Mai 2005

Projektträger – zwischengeschaltetes Finanzinstitut

Italgas, Società Italiana per il gas S.p.A, Italy’s leading gas distribution company.

Ort

Beschreibung

The proposed operation concerns the promoter’s 2005-2008 investment programme for the modernisation and expansion of its gas distribution networks throughout Italy.

Ziele

Project investments aim to renovate, rehabilitate, modernise and expand the promoter’s gas distribution networks in all areas where the promoter operates, hence maintaining standards of service to existing consumers as well as providing for growth in demand. Increasing penetration of gas in domestic, commercial and industrial sectors will displace less efficient and more polluting sources of energy, thereby contributing to EU objectives of the rational use of energy and of environmental protection.

Kommentar(e)

Gas Distribution.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

Up to EUR 200 million.

Gesamtkosten (voraussichtlicher Betrag)

Project cost is expected to be of the order of EUR 600 million.

Umweltaspekte

Gas distribution networks fall under the Annex II of the EIA directive 97/11, leaving it to the competent authority to decide on the need for an EIA. All of the schemes currently included in the project concern low and medium pressure pipelines in urban areas for which EIAs are not required under the Italian law. The project is not expected to have a significant impact on any nature conservation area given its location along existing streets and roads. This will be verified during appraisal and written confirmation from the Natura 2000 competent authority will be required if necessary.

Auftragsvergabe

The promoter has confirmed compliance with the requirements of EU procurement directive 93/38. Procurement activities for the various regional gas distribution companies involved are centralised and coordinated by the promoter.

Projektstatus

Unterzeichnet - 1/12/2005

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Italien Energie