Suche starten De menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20040143
Veröffentlichungsdatum: 30 Juli 2004

Projektträger – zwischengeschaltetes Finanzinstitut

Docklands Light Railway Limited (DLR Limited). DLR Limited is a private limited company wholly owned by Transport Trading Limited, which is itself owned by Transport for London ("TfL") which is the Greater London Authority's organisation responsible for planning and provision of transport in London.

Ort

Beschreibung

The Concessionaire will design, build, finance, maintain and make available to DLR Limited the 2.5-km Woolwich Extension (from London City Airport to Woolwich Arsenal) of the Docklands Light Rail for the purposes of DLR Limited operating a revenue-generating passenger train service.

Ziele

The project is situated in an objective 2 area: Woolwich has been identified as a major regeneration area within the Thames Gateway to the East of London. The Woolwich area remains a depressed area containing some of the most deprived urban wards in England. Improvements in accessibility will be an important component in its economic regeneration.

Kommentar(e)

Urban Transport.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

Up to 50% of senior debt.

Gesamtkosten (voraussichtlicher Betrag)

n/a.

Umweltaspekte

A detailed Environmental Statement has been produced and subjected to scrutiny at the Public Inquiry held in accordance with the Transport and Works Act procedure. The project does not lie within 5 km of any statutorily designated habitat sites. The Order, issued by the Secretary of State in February 2004, constitutes its formal environment approval.

Auftragsvergabe

The tender notice was published in the OJEU on 28/11/2003. DLR Limited issued the invitation to tender to four pre-qualified consortia on 16/04/2004. The bids are due on 01/09/2004 and preferred bidder is expected to be announced in 12/2004. Contract award is foreseen for first semester of 2005.

Projektstatus

Unterzeichnet - 31/05/2005

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Vereinigtes Königreich Verkehr