Veröffentlichungsdatum: 14 Juli 2004
Projektträger – zwischengeschaltetes Finanzinstitut
Gestor de Infraestructuras Ferroviarias (GIF).Ort
Beschreibung
The project consists of the construction of the high-speed rail infrastructure between Cordoba and Malaga, both located in the Region of Andalucia (objective 1 area).
Ziele
The project is a priority TEN and a key component of the Spanish high-speed rail network. The new line will connect with the existing high speed line from Seville to Madrid, and from there to Barcelona and France, thus providing interoperability with the European rail network.
Kommentar(e)
Rail.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Up to 50% of the total project cost.
Gesamtkosten (voraussichtlicher Betrag)
Around EUR 2000 million.
Umweltaspekte
Compliance with EU environmental directives and national laws shall be ensured.
Auftragsvergabe
Compliant with EU Directives.
Projektstatus
Unterzeichnet - 29/11/2005
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).