Veröffentlichungsdatum: 24 Juni 2004
Projektträger – zwischengeschaltetes Finanzinstitut
Veneta Sanitaria Finanza di Progetto S.p.A. (VFSP).Ort
Beschreibung
The project concerns the construction of a new hospital to replace an inadequate existing hospital. The project will be designed, built and operated by VSFP under a long-term concession granted by the local health authority.
Ziele
The new hospital will overcome the shortfalls of the existing hospital and will allow the area of Venice/Mestre to consolidate and improve specialist hospital services (e.g. oncology, cardiology, eye surgery).
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Approximately EUR 70m.
Gesamtkosten (voraussichtlicher Betrag)
Approximately EUR 230m.
Umweltaspekte
The project implies works on a greenfield site in a relatively rural setting in the borders of Mestre, which is not a protected area and does not present any specific nature conservation issues. In addition, the selected architectural design aims at integrating the building with the environment by using green areas and terraces.
Auftragsvergabe
The project has been procured in line with Italian legislation on the procurement of public works through project financing. The use of the project finance procedure was advertised in the EU Official Journal in December 2000.
Projektstatus
Unterzeichnet - 19/04/2005
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).