Veröffentlichungsdatum: 2 Mai 2002
Projektträger – zwischengeschaltetes Finanzinstitut
Ministry of Agriculture of the Czech Republic, with the River Boards and the Agricultural Water Management Authority as implementing agencies.Ort
Beschreibung
The project concerns the first stage of the national Flood Protection Strategy and includes a number of priority schemes designed to mitigate flood risk in favour of an estimated 550 000 population.
Ziele
The measures implemented by the project will safeguard human health, contribute to river basin management in line with the EU Water Framework Directive, and support the trans-boundary activities of the river basin commissions of Elbe, Oder and Danube. The project is a pre-requisite for lowering the risk of future economic disruption as well as for a stable economic development in the affected regions and will improve the quality of life of the people residing in the Morava, Oder and Elbe basins.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 60 mio for a first tranche
Gesamtkosten (voraussichtlicher Betrag)
Cost estimated by the Bank at EUR 197 mio. Cost of the first tranche estimated by the promoter at EUR 120 mio
Umweltaspekte
Schemes are screened and, where applicable, EIAs will be carried out in line with EU Directives 97/11/EC amending 85/337/EEC and 92/43/EEC.
Auftragsvergabe
In line with EU Procurement Directives, tenders for schemes of a cost in excess of EUR 5 m will be published in the OJ of the EU. The others will be subject to national tendering advertised according to Czech law.
Projektstatus
Unterzeichnet - 28/05/2002
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).