Veröffentlichungsdatum: 23 Januar 2002
Projektträger – zwischengeschaltetes Finanzinstitut
Schiphol GroupOrt
Beschreibung
Construction of a fifth runway and associated infrastructure: The new north-south runway, at 3 800 m long and 60 m wide will be capable of accommodating aircraft operating on long-haul routes and will be operable in all weather conditions.
Ziele
The fifth runway will make an essential contribution in meeting environmental constraints of the airport, as it will significantly reduce the amount of noise in surrounding residential areas while ensuring the continued development and growth of the airport.
Kommentar(e)
Airport operations
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 150 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 382 million
Umweltaspekte
Full EIA procedures have been undertaken prior to planning approval including an extensive public enquiry process.
Auftragsvergabe
Past procurement procedures followed open procedures and were advertised in the OJEC consistent with EC Directives. Future contracts will be advertised and tendered in accordance with these directives.
Projektstatus
Unterzeichnet - 3/10/2002
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).