Veröffentlichungsdatum: 17 Februar 2005
Projektträger – zwischengeschaltetes Finanzinstitut
Compania Nationala de Cai Ferate – CFR - SAOrt
Beschreibung
The project includes the rehabilitation and modernization of the 184 km railway line from Curtici to Simeria, along Pan-European Transport Corridor IV, to reach maximum speeds of 160 km/h.
Ziele
- sustainable mobility along the Corridor IV,
- increased travel speeds,
- reduced travel time for passengers and goods,
- increased transport safety,
- increased inter-operability with EU standards.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 300 million.
Gesamtkosten (voraussichtlicher Betrag)
EUR 850 million.
Umweltaspekte
The majority of the works will be on the existing railway right-of way and will not require particular environmental studies. However, the station refurbishments and the section of re-alignment will be subject to national and EU environmental regulations and requirements.
Auftragsvergabe
Procurement will be undertaken in line with the EIB Guide to Procurement.
Projektstatus
Unterzeichnet - 27/12/2005
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).