The project (DBFO) consists of the design, building, financing and operation under a 65 years concession of a new toll motorway between Madrid and Ocaña, as well as three sections of the M-50 non tolled ring-road motorway.
Ziele
The project forms part of the TEN road network and will also contribute to regional development by improving traffic conditions for transit traffic in the southern area of metropolitan Madrid.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Up to 50% of the total project cost
Gesamtkosten (voraussichtlicher Betrag)
Around EUR 700 million
Umweltaspekte
The promoter is required to respect the regulations imposed by the Directive 97/11/EC. An Environmental Impact Assessment has been realised. In accordance with its normal procedure, the Bank will ensure that appropriate measures have been taken as regards environmental protection ; in particular special measures for impact mitigation have been clearly identified during the design process.
Auftragsvergabe
The project was advertised in the Official Journal of the EU on 21.04.2000 in accordance with Directive 93/37/CEE and the concession contract was awarded on 29.12.2000.
Projektstatus
Unterzeichnet - 27/01/2003
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).