Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten

    Unterzeichnung(en)

    Betrag
    36.700.000 €
    Länder
    Sektor(en)
    Deutschland : 36.700.000 €
    Industrie : 36.700.000 €
    Unterzeichnungsdatum
    2/12/2022 : 36.700.000 €
    Link zum projekt

    Übersicht

    Veröffentlichungsdatum
    16 Juni 2022
    Projektstatus
    Referenz
    Unterzeichnet | 02/12/2022
    20220367
    Projekttitel
    Projektträger – Finanzintermediär
    P-CAM COMMERCIAL DEMO PLANT (IEU GT)
    PURE BATTERY TECHNOLOGIES PTY LTD
    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
    Gesamtkosten (voraussichtlicher Betrag)
    EUR 37 million
    EUR 73 million
    Ort
    Sektor(en)
    • Industrie - Verarbeitendes Gewerbe/Herstellung von Waren
    Beschreibung
    Ziele

    The project consists of the construction and operation in Hagen, Germany, of an innovative first-of-its-kind commercial demonstration plant for the manufacturing of precursor cathode active material (nickel, manganese and cobalt in a specific ratio), which is used in the production of advanced Lithium-ion cells.

    The project will demonstrate commercial-scale operation of an innovative technology to produce precursor cathode active material ("pCAM"). The production process utilises two novel processing steps, which reduce the carbon footprint, improve safety and reduce cost of manufacturing pCAM.

    Additionality and Impact

    The project is eligible under Article 309 point (c) Common interest, and qualifies under the Bank's "Innovation; Digital and Human Capital" public policy goal.


    The project concerns the first full-scale production of an innovative process to produce pCAM, a material that is used in electric vehicle batteries. The production process utilises two novel processing steps which reduce the carbon intensity, improve safety and reduce cost of manufacturing pCAM. The process is unique in that it can operate on both primary raw material call MHP (mixed hydroxide precipitate) and secondary waste battery material (black mass). The process is capable of operating on 100% black mass. 


    The Bank provides the Promoter with high risk debt financing in order to support the commercialization of its innovation (first full commercial scale plant). This type of financing is difficult to access for innovators with a limited track record. The EIB's contribution helps provide both diversification with regard to the promoter's funding mix and a longer maturity.


    Thanks to the GTT financing, the promoter is able to achieve an adequate equity/debt mix and crowd-in private investors. Having access to EIB financing also allows the Promoter to accelerate the deployment of his innovation and reach the market faster.

    Umweltaspekte
    Auftragsvergabe

    The proposed demonstration plant will be the first-time deployment of a novel process to produce pCAM, which is used to produce batteries for electric vehicles. The process is breakthrough in terms of low energy requirements, which results in a significant reduction in the greenhouse gas (GHG) emissions compared to conventional technology. The process also utilises less hazardous chemicals compared to the conventional process. The process is also capable of operating on recycled battery material which leads to further GHG savings compared to primary raw materials. The demonstration plant is subject to the licensing requirements of the German Federal Emission Control Act, including a preliminary environmental impact assessment under the UVPG. These laws include the implementations of the IED and EIA Directives. The respective studies have been submitted and the approval process will be followed by a public consultation period. The promoter is in close contact with the competent authorities and stakeholders. The installation also falls under the SEVESO directive as well. The final permit will encompass the operational and construction permits as well as the SEVESO requirements.

    The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions. However, if at the project appraisal, the EIB were to conclude that the promoter is subject to the EU public procurement legislation then the Bank would duly inform the Commission Services and would require the promoter to apply those rules.

    Projekte zum thema
    Link zum projekt

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Dokumente

    Formblatt ökologische und soziale Aspekte - P-CAM COMMERCIAL DEMONSTRATION PRODUCTION PLANT
    Datum der Veröffentlichung
    29 Nov 2022
    Sprache
    Bereich
    Finanzierung
    Nummer des Dokuments
    161204858
    Thema
    Umweltinformationen
    Projektnummer
    20220367
    Sektor(en)
    Länder
    Öffentlich zugänglich
    Jetzt herunterladen

    Aktuelles und Storys

    Allgemeine Fragen und Anmerkungen

    Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträgerinnen und Interessenträger, sich konstruktiv einzubringen.
    Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
    Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
    Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

    Medienanfragen

    Medienanfragen können Sie an die Pressestelle der EIB richten. Bitte besuchen Sie auch unseren Pressebereich.

    Beschwerdemechanismus

    Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht der Beschwerdemechanismus der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

    „Null Toleranz“ gegenüber Betrug und Korruption

    Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und den Leitlinien für Betrugsbekämpfung behandelt.

    Weitere Veröffentlichungen