Suche starten DE menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten

    Unterzeichnung(en)

    Betrag
    50.000.000 €
    Länder
    Sektor(en)
    Irland : 50.000.000 €
    Bildung : 50.000.000 €
    Unterzeichnungsdatum
    20/12/2023 : 50.000.000 €

    Übersicht

    Veröffentlichungsdatum
    8 März 2023
    Projektstatus
    Referenz
    Unterzeichnet | 20/12/2023
    20210091
    Projekttitel
    Projektträger – Finanzintermediär
    CORK BUSINESS SCHOOL
    UNIVERSITY COLLEGE CORK
    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
    Gesamtkosten (voraussichtlicher Betrag)
    EUR 50 million
    EUR 130 million
    Ort
    Sektor(en)
    Beschreibung
    Ziele

    The project concerns the construction of a new 15,000m2 business school at University College Cork (UCC) in the centre of the city of Cork in southern Ireland. The project will support the consolidation of the business school departments into one site in modern facilities to enhance the teaching and learning environment.

    The Project contributes to the European Higher Education Area by providing modern facilities and additional space for quality teaching in a key higher education institution in Ireland. The Project is in line with the Irish Government's 'Project Ireland 2040'. The National Planning Framework prioritising balanced regional development outside of Dublin. Cork is one of Ireland's fastest growing regions and the development of the business school is expected to play a specific role in ensuring the region is attractive to business investment and provides access to quality higher education for the region's youth. The project is therefore eligible under Article 309 point (c) common interest (Innovation, Human Capital).

    Zusätzlichkeit und Wirkung

    The project addresses a demography-driven investment gap with regard to the provision of places in higher education in Ireland. Public higher education has the nature of a public good for which the operator cannot capture sufficient financial benefits, justifying public intervention.

    The Project provides a modern state-of-the-art academic environment for students and staff in a key higher education institution in Ireland. The new building will provide space for the business school's expansion in light of a demography-driven increase in the number of domestic students, and supports the university's aim to be globally competitive and attract and increasing number of international students. 

    The building will be a highly energy performing building and includes climate adaptation measures.


    The financing proposed offers features such as revisable rates, longer grace periods and a long tenor that improve the affordability of the project.


    Umweltaspekte
    Auftragsvergabe

    Directive 2011/92/EU amended by Directive 2014/52/EU on Environmental Impact Assessment (EIA) does not specifically cover higher education infrastructure, leaving it at the discretion of the responsible competent authorities to request an EIA on the basis of the location and scale of the works concerned. However, higher education infrastructure may fall under Annex II of the Directive with respect to urban development. The public buildings will be required to at least meet the energy efficiency targets as defined in Directive 2010/31/EU on the energy performance of buildings and Directive 2012/27/EU on energy efficiency. The project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate mitigation and climate adaptation. Social and environmental aspects as well as any aspects related to historical and cultural heritage will be verified during the appraisal.

    The Bank will require the promoter to ensure that contracts for implementation of the project will be tendered in accordance with the applicable EU procurement legislation, Directive 2014/24/EU as well as Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Phase
    In Prüfung
    Genehmigt
    Unterzeichnet
    17 April 2023
    20 Dezember 2023

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Dokumente

    Formblatt ökologische und soziale Aspekte - CORK BUSINESS SCHOOL
    Datum der Veröffentlichung
    18 Apr 2023
    Sprache
    Bereich
    Finanzierung
    Nummer des Dokuments
    162564114
    Thema
    Umweltinformationen
    Projektnummer
    20210091
    Sektor(en)
    Länder
    Öffentlich zugänglich
    Jetzt herunterladen
    Andere Links

    Allgemeine Fragen und Anmerkungen

    Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträger, sich konstruktiv einzubringen.
    Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
    Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
    Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

    Medienanfragen

    Medienanfragen können Sie an die Pressestelle der EIB. Bitte besuchen Sie auch unseren Pressebereich.

    Beschwerdeverfahren

    Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht das Beschwerdeverfahren der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

    „Null Toleranz“ gegenüber Betrug und Korruption

    Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und der Betrugsbekämpfungspolitik behandelt.

    Weitere Veröffentlichungen