corporate_banner_en

CENTRALE SOLAIRE DE OUARZAZATE

Projects
Regions
European Union
Enlargement countries
European Free Trade Association
Mediterranean Neighbourhood
FEMIP Overview
Maximizing synergies
Financing & advisory services
Loans
Private equity
Advisory services
FEMIP Support Package
Procurement for TA operations
How to apply
Trust Fund
Technical advisory
Private equity
MED 5P
Organisation and staff
FEMIP Internship Programme
FEMIP Secondment Programme
FAQ - FEMIP
EU Eastern Neighbours
Projects
Cooperation with other institutions and organisations
Financing facilities
Trust fund
Examples of EPTATF Operations
Institutional framework
Applying for loans
Organisation and staff
Central Asia
Institutional framework
Cooperation with other institutions and organisations
Financing facilities
Technical assistance and grants
Applying for loans
Organisation and staff
Sub-Saharan Africa, Caribbean and Pacific
Funding and Financial Instruments
Applying for loans
Cooperation with partners
Investment Facility
Other initiatives
Activities
Asia and Latin America
Priorities
SMEs
Innovative options
Loans
Microfinance
EU partners for SMEs & mid-caps
Non-EU partners for SMEs & mid-caps
RDI support
Equity investment
Regional development
Climate Action
Activities
Financial instruments and advice
Climate Mainstreaming
Urban & natural environment
Agriculture and the rural economy
Innovation
Skills and Jobs
Trans-European Networks
Transport
Energy
Project Cycle
Applying for a loan
Appraisal
Procurement
Monitoring
Projects to be Financed
Explanatory notes
Breakdown by region
European Union
EFTA countries
Enlargement Countries
Eastern Europe, Southern Caucasus and Russia
Mediterranean countries
Africa, Caribbean, Pacific countries + OCT
South Africa
Asia and Latin America
Breakdown by sector
Projects Financed
Breakdown by region
European Union
EFTA countries
Enlargement Countries
Eastern Europe, Southern Caucasus and Russia
Mediterranean countries
Africa, Caribbean, Pacific countries + OCT
South Africa
Asia and Latin America
Breakdown by sector
Multi-criteria list
Operations Evaluation
Process and methodology

CENTRALE SOLAIRE DE OUARZAZATE

  •  Reference: 20100242
  •  Release date: 19 September 2011
Promoter – Financial Intermediary

Moroccan Agency for Solar Energy (“MASEN”)

Location
Description

The 500 MW Ouarzazate complex is the first project launched under the Moroccan Solar Plan. It will be developed through different successive phases. The project is the first phase of the complex and will follow the Independent Power Producer model already implemented in Morocco. It is expected to comprise one thermal solar power plant with a production capacity between 125 and 160 MW, with a minimum of around 450 MWh of thermal storage. The project is scheduled to begin operation in early 2014.

Objectives

The Moroccan Solar Plan is one of the six concrete projects of the Union for the Mediterranean, launched by the Euro-Mediterranean Heads of State and Government during the Paris Summit, held on 13th July 2008, to promote the production and use of renewable energies (more specifically, turning the Mediterranean partner countries into producers and exporters of solar energy).

Comments

This operation is covered by the EU Guarantee for EIB loans outside the EU.

Sector(s)
Proposed EIB finance (Approximate amount)

EUR 300 million

Total cost (Approximate amount)

EUR 676 million

Environmental aspects

If the project were located within the EU, it would fall under Annex II of the EIA-Directive (85/337/EEC) as amended. In line with national legislation (EIA Law No.12-03), the promoter intends to follow an EIA procedure for the project. A scoping environmental and social study has been prepared for the whole Ouarzazate complex, and the promoter will require that the successful bidder for the first phase (i.e. the project) performs an EIA. Details of the Environmental procedures to be carried out, including possible impacts on any sites of nature conservation importance, will be investigated further by the Bank during appraisal to ensure that the project complies with the Bank’s principles and standards as regards environmental and social issues.

Procurement

Within the EU, the promoter, being a public contracting authority, would be subject to public procurement procedures according to 2004/17/EU, including publication of contract notices in the Official Journal of the EU. In line with the Bank’s principles and its statute, the promoter is following the provisions of the Bank’s Guide to Procurement, which includes amongst others international competitive bidding and Official Journal of the EU contract notice publication for the items to be financed by the Bank.

Status

Signed   -   19/11/2012.

Related Documents
  • 19-09-2011 - Framework Environmental Impact Assessment study (FESIA-EIS) - Ouarzazate Complex FR
  • 04-10-2013 - Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA) - Specific Environmental Impact Assessment study (SESIA-EIS) – Ouarzazate 1 EN
  • 04-10-2013 - Land Acquisition Plan – Ouarzazate Complex FR

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).



 Print
Copyright © European Investment Bank 2014
The European Investment Bank is not responsible for the content of external internet sites.

http://www.eib.org/projects/pipeline/2010/20100242.htm