Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20140557
    Veröffentlichungsdatum: 12 Februar 2015

    Projektträger – zwischengeschaltetes Finanzinstitut

    METSÄ FIBRE OY

    Ort

    Beschreibung

    Construction of a new 1.3 million tonnes per annum (tpa) bio-product mill in Äänekoski, Finland.

    Ziele

    The new bio-product mill will replace the old pulp mill in the same location.

    Sektor(en)

    • Industrie - Verarbeitendes Gewerbe/Herstellung von Waren

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 275 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 1225 million

    Umweltaspekte

    The project falls under the scope of Annex I of Directive 2011/92/EC and is subject to Directive 2010/75/EC. A full environmental impact assessment (EIA) is required. The promoter has prepared a full EIA study and is currently undergoing the permitting procedure with public consultation executed in 2014 (http://www.ymparisto.fi/aanekoskenbiotuotetehdasYVA). The project will be implemented in an existing industrial site far from any site of nature conservation. Full environmental assessment (including application of best available techniques for emission control) will be executed during the project's due diligence.

    Auftragsvergabe

    The promoter has been assessed by the EIB as being a private company not operating in the utilities sector and not having a status of a contracting entity, thus not being subject to EU rules on public procurement. However, if after the project appraisal, the EIB were to conclude that the promoter is after all subject to EU public procurement legislation (i.e. Directive 2004/17/EC), then the Bank would require the promoter to ensure that contracts for the implementation of the project have been/will be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2004/17/EC and Directive 92/13/EEC), with publication of tender notices in the EU Official Journal, as and where required.

    Projektstatus

    Unterzeichnet - 10/06/2015

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Finnland Industrie