Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20090403
    Veröffentlichungsdatum: 11 Januar 2010

    Projektträger – zwischengeschaltetes Finanzinstitut

    Reggefiber Group BV

    Ort

    Beschreibung

    The project concerns the roll-out of a new passive optical fibre telecommunication access network in 33 cities in the Netherlands. The network will connect central nodes with individual households by optical fibres and will be available on an equal (“Open”) basis to all telecom operators interested in the provision of ultra high speed broadband services.

    Ziele

    This project will assist in providing high speed broadband services, in competition with other existing platforms. The project supports the renewed Lisbon Strategy to roll out high-speed internet in order to stimulate innovation and keep Europe at the forefront of internet usage, and to reach the goal of a 30% high speed broadband penetration of the EU population.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 130 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 290 million total eligible project cost (total project cost for 33 cities 540 million)

    Umweltaspekte

    Investments in fixed telecommunications projects (mainly civil works for urban fibre roll-out and long distance transmission systems) do not fall under Annex I of Directive 85/337 EC as amended by Directives 97/11/EC and 2003/35 EC. The related works have limited environmental effects, apart from disturbances during civil work constructions, which can be mitigated by appropriate measures. Therefore it is not expected that the works will be subject to Annex II of the Directive. Full environmental details will be assessed during appraisal, including the possible impacts on protected flora and fauna (Habitats 92/43/EC and Birds 79/409/EC).

    Auftragsvergabe

    According to Utility Directive 2004/17/EC the Telecom sector is exempt from public procurement procedures due to its competitive nature. Hence the purchasing of the private promoter is not regulated. The effectiveness of the applied procedures will be assessed during appraisal.

    Projektstatus

    Unterzeichnet - 29/10/2010

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Niederlande Telekommunikation